flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

High court, big impact: San Diego Central Courthouse

Building Team Awards

High court, big impact: San Diego Central Courthouse

Gold Award: San Diego’s high-rise courthouse increases access to justice for citizens by consolidating 71 court departments.


By David Barista, Editorial Director | May 15, 2018
SD Courthouse

Bruce Damonte, courtesy SOM

Rising 24 stories in the center of downtown San Diego, the San Diego Central Courthouse, with its subtractive massing and slender form, topped with a dramatic aluminum-panel crown structure, makes a bold architectural statement about the future of civic buildings in America’s Finest City.

The 704,000-sf facility, on a former brownfield site at the intersection of Union and C Streets, is designed to serve as a catalyst for an emerging government district. It consolidates 71 departments across San Diego County’s criminal trial, family, and civil courts in a 21-story tower that sprouts from a three-story podium structure.

The high-volume functions of the criminal courts—arraignment courts, misdemeanor courts, offices, jury assembly rooms, business offices, cafeteria—are located within the podium. These functions are serviced by a cascading stair and escalator along a three-story lobby, which connects with a vestibule and a raised entry plaza. A fritted glass curtain wall brings natural light into the corridor.

 

The courthouse is crowned with a distinctive canopy and soffit of shaped aluminum panels, which are arranged to capture and reflect southern and western light back onto the underside of the structure’s surface. Bruce Damonte, courtesy SOM.

 

In the tower, the plan is organized based on a module of two pairs of courtrooms with a holding core in between. Clear and separate circulation paths are provided for the public and staff.

The courthouse connects via bridge to the adjacent Hall of Justice, at the third level. The bridge is accessible by escalator from the lobby and is adjacent to the new 500-person jury assembly room, permitting members of the public who have passed through security in either building to pass between buildings, and allowing the jury assembly room to serve both buildings.

 

The high-volume functions of the criminal courts are located within the podium and are serviced by a cascading stair and escalator along a three-story lobby. Bruce Damonte, courtesy SOM.

 

Working with the client, the project team delivered on several key owner objectives, including:

— Flexible, adaptable spaces. The client desired a building that could easily adapt to meet future needs. For example, the design of the family, probate, and civil courts is identical to the criminal trial courts, with the exception of the jury box. This allows the criminal courts to be converted to family or civil courts. Also, the jury deliberation rooms are sized to be convertible to judicial chambers, and the business offices in the podium feature large open floor plans for future programmatic evolution.

— Landmark design that celebrates the skyline. While not the city’s tallest building, the courthouse is among its most distinctive high-rises, with its angular, monolithic form topped with a distinguishing canopy structure that shades its east façade. Shaped aluminum panels form the soffit for the canopy and are arranged to capture and reflect southern and western light back onto the underside of the structure’s surface. This design feature gives the courthouse a bold civic identity within the skyline and “celebrates the unique light of San Diego,” say its designers.

— Enhanced seismic design. After evaluating several structural options, the team selected a solution that was both cost effective and would meet the client’s “enhanced” seismic performance objective. The structural system consists of a cost-efficient steel-framed superstructure with two-way lateral special moment frames that incorporate 106 nonlinear viscous damping devices (VDD). The VDDs were placed along the height of the structure, from level six to the roof, with four to six VDDs at each level. The viscous dampers provide a distributed supplemental energy dissipating damping system over the height of the structure to reduce seismically induced building story shears, story drifts, floor accelerations, and inelastic rotational demands on moment frame beam-column joints. They are also effective in providing damping for wind loads.

“The San Diego Central Courthouse increases the access to justice for citizens of San Diego County by consolidating 71 court departments,” said Clifford Ham, Judicial Council of California Administrative Office of the Courts. “The building is both noble and efficient, representing the importance of the Superior Court of California in this community and providing a safe, well-organized, technically sophisticated environment for the judicial proceedings.”

 

The project team built models and full-scale mockups to gather feedback from the judges, court staff, and secretarial user groups. Courtesy SOM.

 

 

Building Team — Submitting firm, architect, structural engineer Skidmore, Owings & Merrill Owner Judicial Council of California Administrative Office of The Courts MEP engineer WSP General contractor Rudolph and Sletten

General Information — Size 704,000 sf Construction cost $465 million Construction time December 2013 to December 2017 Delivery method Design-bid-build

 

Return to the 2018 Building Team Awards Landing Page

Related Stories

Building Team Awards | Jun 12, 2019

Delectable design: A traditional French pastry was the concept behind the Krause Gateway Center

Gold Award: Krause Gateway Center’s striking design takes its cue from the traditional French dessert mille feuille.

Building Team Awards | Jun 11, 2019

Learning by doing: Students took an active role in the design of the Bay Area's d.tech high school

Gold Award: D.tech had been occupying temporary spaces that were hardly suited for design thinking.

Building Team Awards | Jun 10, 2019

Technology showcase: PTC's new digs combine lively workspaces with exhibits for its products and platforms

Gold Award: PTC began its fitout even as 121 Seaport was still under construction.

Building Team Awards | Jun 7, 2019

Fast delivery: Construction of McDonald's global headquarters was completed in under seven months

Gold Award: The building has a remarkably diverse array of spaces that include “work neighborhoods.”

Building Team Awards | Jun 7, 2019

Unifying force: A place where a million Tulsans can connect, one by one

Platinum Award: Gathering Place is a 66½-acre public park and playground serving the nearly one million residents of greater Tulsa, Okla.

Building Team Awards | May 24, 2018

Green machine: Janet Durgin Guild and Commons at Sonoma Academy

Honorable Mention: A college prep school gets an uber-green maker space and cooking lab.

Building Team Awards | May 24, 2018

Good neighbor: Wentz Science Center at North Central College

Bronze Award: A conscientious Building Team takes steps to minimize the impact of this large-scale science center project in a historic neighborhood.

Building Team Awards | May 23, 2018

13 projects earn BD+C's 2018 Building Team Awards

Iowa’s game-changing correctional institution and Chicago’s daring hotel and sports development are among 13 projects to earn honors in BD+C’s 2018 Building Team Awards.

Building Team Awards | May 23, 2018

Engineered for extremes: Talan Towers

Bronze Award: Astana’s shimmering mixed-use towers are made to stand up to the region’s harsh, long winters.

Building Team Awards | May 22, 2018

High-tech haven: The Spark at Washington State University

Silver Award: A ‘teaching in the round’ classroom highlights this innovation hub at Washington State University’s Pullman campus.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021