flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

HGA-designed hotel becomes one of the tallest buildings in Rochester, Minn.

Hotel Facilities

HGA-designed hotel becomes one of the tallest buildings in Rochester, Minn.

The project is part of the city’s Destination Medical Center initiative.


By David Malone, Associate Editor | February 12, 2020
Hilton Lobby

All photos: Peter J. Sieger

The Hilton Rochester Mayo Clinic Area hotel is now open in Rochester, Minn. 

The 264-room, 20-story hotel is one of the first completed projects in Rochester’s Destination Medical Center initiative – a public-private partnership to position Rochester as the world’s leading destination for health and wellness. The hotel offers a blend of dining, hospitality, conferencing, and wellness options for area residents, the business community, and medical tourism. 

 

Hilton Ballroom

 

The 371,000-sf, L-shaped tower’s first five floors offer visitors retail options, two grand ballrooms, a 24-hour fitness center with a heated infinity pool, a spa, and an outdoor terrace. Two restaurants will also be included. 

A two-way steel truss system and specialized vibration analysis methods allowed the design team to stack two 9,000-sf ballrooms on top of each other to create more space for conferences and programs. The solution lowered the height of the building by 10 feet compared to a traditional truss system, resulting in significant cost savings.

 

HIlton rochester lobby

 

See Also: New York City’s largest freestanding cancer center opens

 

Building amenities and features include:

Level 1

Guest check-in, hotel lobby, business center, Pittsburgh Blue, 

The Social Wine and Martini Bar, support spaces

 

Level 2

Skyway and parking ramp access, retail, offices, J. Powers at the Hilton,

Benedict’s restaurant, Cambria showroom, Healing Touch Spa 

 

Level 3

Ballroom 1 and pre-function space

 

Level 4

Ballroom 2 and flexible break-out space

 

Level 5

24-hour fitness center with heated, indoor infinity pool; sauna; steam room; roof terrace

 

Levels 6-15

Guest room and corner suites

 

Levels 16-18

Executive levels, connected via an internal stair, with access to an Executive Lounge 

 

Level 19

Governor and Presidential Suites, VIP Lounge

 

Level 20

Elevator machine room and mechanical penthouse

 

Hilton Pool

 

Titan Development & Investments and Harbor Bay Real Estate Advisors were the project developers. Kraus-Anderson was the cm.

 

 

Related Stories

Hotel Facilities | Oct 12, 2021

510-room Hyatt Place Hotel completes in Chelsea

The project broke ground in January 2019.

Hotel Facilities | Sep 27, 2021

New resort will be carved directly into a mountainside

The project is is located in western Saudi Arabia.

Hotel Facilities | Sep 22, 2021

Will hotel developers finally embrace modular construction?

Last May, MiTek, a construction software and building services company that’s part of Warren Buffett’s Berkshire Hathaway conglomerate, formed a partnership with Danny Forster & Architecture to promote modular design and construction.

Giants 400 | Aug 30, 2021

2021 Giants 400 Report: Ranking the largest architecture, engineering, and construction firms in the U.S.

The 2021 Giants 400 Report includes more than 130 rankings across 25 building sectors and specialty categories.

Hotel Facilities | Aug 26, 2021

Building hotels with modules, with citizenM's Menno Hilberts

In this exclusive interview for HorizonTV, Menno Hilberts, Managing Director of Project Management with hotelier citizenM, explains how the company is employing modular construction to help double its presence in the U.S. 

Resiliency | Aug 19, 2021

White paper outlines cost-effective flood protection approaches for building owners

A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.

Hotel Facilities | Aug 16, 2021

7 Cedars Hotel completes on Washington’s Olympic Peninsula

Rice Fergus Miller Architecture designed the project.

Hotel Facilities | Aug 11, 2021

Jasper Architects wins design competition for hotel in Kuwait

The project is inspired by Kuwait’s desert landscape.

Market Data | Jul 28, 2021

Marriott has the largest construction pipeline of U.S. franchise companies in Q2‘21

472 new hotels with 59,034 rooms opened across the United States during the first half of 2021.

Market Data | Jul 26, 2021

U.S. construction pipeline continues along the road to recovery

During the first and second quarters of 2021, the U.S. opened 472 new hotels with 59,034 rooms.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021