flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Getting the Most Value When You Value Engineer DWV Systems

Sponsored Content Plumbing

Getting the Most Value When You Value Engineer DWV Systems

PVC can be used successfully below ground, but it requires careful installation and soil prep 


By Charlotte Pipe | November 13, 2015
Getting the most value when you Value Engineer DWV systems

The largest building project in recent NCAA history, the T. Boone Pickens Stadium at Oklahoma State University.

Plumbing should always be looked at in the VE process, if for no other reason than there are a lot of units of pipe in a project. There are lots of places in a DWV system where value can be captured, but there are applications where what looks like value can mask risks that you might not want to take.

Because of financial realities, value engineering can often mean the difference between a project being shelved or a building being built. This creates tremendous pressure for VE practitioners to lower the first cost of any project. Often, this is a reasonable thing to do. The danger is that, when pushed too far, cost-cutting can add unacceptable risk, lower the value of the building and hide expenses in the total cost of ownership. That's what happened with the largest building project in recent NCAA history, the T. Boone Pickens Stadium at Oklahoma State University. 

The Facts

In 2011, two years after the Stadium opened, a break in a plastic drain pipe was found. An inspection of the rest of the system revealed 15 other breaks. The football team was forced to abandon the facility for five months while contractors jackhammered thorough concrete floors to fix the problems.

Litigation was eventually settled in February 2015, for $700,000. The biggest portion of the settlement ($400,000) was paid by the firm that did the architectural, engineering and design work. The manufacturer of the water heaters used in the renovations, agreed to pay $125,000 of the settlement. This suggests that the maximum working temperature of PVC was exceeded, leading to collapse and failure. Unfortunately, this avoidable mistake is more common than it should be. 

The Take-Aways

PVC can be used successfully below ground, but it requires careful installation and soil prep per ASTM D2321. Further, if its maximum working temperature will be exceeded, it can't be used. PVC is only a value when it doesn't fail. To make value engineering DWV systems easier to understand, we have prepared a downloadable brochure and handy checklist.

At Charlotte Pipe, we make both PVC and Cast Iron pipe. We are proud of the products that we make with both materials, but it doesn't do anybody any good when a fine material is used in the wrong application. If you have any questions about value engineering DWV systems -- even if you aren't using our pipe -- please call Charlotte’s Technical Services Department at 800-438-6091.

Tags

Related Stories

Plumbing | May 4, 2021

Elkay Joins Plumbing Manufacturers International

Elkay is a family-owned manufacturer of sinks, faucets, drinking water solutions, and other plumbing products. 

Multifamily Housing | Mar 7, 2021

New Olympia i3 kitchen faucet: geometric lines, minimalist style

Announcing the new Olympia i3 single handle pull-down kitchen faucet for today's modern kitchen.

75 Top Building Products | Dec 3, 2020

Top Plumbing Products for 2020

Kohler's Graze smart faucet and Bradley Corp.'s L-shaped WashBar are among the 5 new plumbing products to make Building Design + Construction's 2020 75 Top Products report.

Plumbing | May 5, 2020

Viega hosts online training

Contractors who want to increase their knowledge and add skills can now receive Viega LLC training online and interact with trainers.

Sponsored | Plumbing | May 4, 2020

Tankless water heaters improve water heating efficiency in an Indiana condo community

Cascaded Navien NPE-240A tankless water heaters installed in three phases.

Multifamily Housing | Apr 23, 2020

Tankless water heaters: 12 things to know about these energy savers for multifamily housing

Twelve factors to consider in using tankless water heaters in multifamily housing.

Continuing Education and Life Time Learning | Apr 3, 2020

Online technical training sessions on tankless water heaters and boilers

Tankless water heaters and boiler training for plumbing contractors.

Plumbing | Mar 13, 2020

Pioneer Industries launches new website

Pioneer Industries launches new website

75 Top Building Products | Dec 16, 2019

101 Top Products for 2019

Building Design+Construction readers and editors select their top building products for the past 12 months in the fourth-annual 101 Top Products report.

boombox1 - default
boombox2 -
native1 -

More In Category


Plumbing

EPA to revise criteria for WaterSense faucets and faucet accessories

The U.S. Environmental Protection Agency (EPA) plans to revise its criteria for faucets and faucet accessories to earn the WaterSense label. The specification launched in 2007; since then, most faucets now sold in the U.S. meet or exceed the current WaterSense maximum flow rate of 1.5 gallons per minute (gpm). 



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021