Getting the Most Value When You Value Engineer DWV Systems

Sponsored Content Plumbing

Getting the Most Value When You Value Engineer DWV Systems

PVC can be used successfully below ground, but it requires careful installation and soil prep 


By Charlotte Pipe | November 13, 2015
Getting the most value when you Value Engineer DWV systems

The largest building project in recent NCAA history, the T. Boone Pickens Stadium at Oklahoma State University.

Plumbing should always be looked at in the VE process, if for no other reason than there are a lot of units of pipe in a project. There are lots of places in a DWV system where value can be captured, but there are applications where what looks like value can mask risks that you might not want to take.

Because of financial realities, value engineering can often mean the difference between a project being shelved or a building being built. This creates tremendous pressure for VE practitioners to lower the first cost of any project. Often, this is a reasonable thing to do. The danger is that, when pushed too far, cost-cutting can add unacceptable risk, lower the value of the building and hide expenses in the total cost of ownership. That's what happened with the largest building project in recent NCAA history, the T. Boone Pickens Stadium at Oklahoma State University. 

The Facts

In 2011, two years after the Stadium opened, a break in a plastic drain pipe was found. An inspection of the rest of the system revealed 15 other breaks. The football team was forced to abandon the facility for five months while contractors jackhammered thorough concrete floors to fix the problems.

Litigation was eventually settled in February 2015, for $700,000. The biggest portion of the settlement ($400,000) was paid by the firm that did the architectural, engineering and design work. The manufacturer of the water heaters used in the renovations, agreed to pay $125,000 of the settlement. This suggests that the maximum working temperature of PVC was exceeded, leading to collapse and failure. Unfortunately, this avoidable mistake is more common than it should be. 

The Take-Aways

PVC can be used successfully below ground, but it requires careful installation and soil prep per ASTM D2321. Further, if its maximum working temperature will be exceeded, it can't be used. PVC is only a value when it doesn't fail. To make value engineering DWV systems easier to understand, we have prepared a downloadable brochure and handy checklist.

At Charlotte Pipe, we make both PVC and Cast Iron pipe. We are proud of the products that we make with both materials, but it doesn't do anybody any good when a fine material is used in the wrong application. If you have any questions about value engineering DWV systems -- even if you aren't using our pipe -- please call Charlotte’s Technical Services Department at 800-438-6091.

Tags

Related Stories

| May 15, 2012

National Tradesmen Day set for Sept. 21

IRWIN Tools invites the nation to honor "The Real Working Hands that Build America and Keep it Running Strong".

| May 14, 2012

Codes harvest rainwater

IAPMO’s Green Plumbing and Mechanical Code Supplement could make rainwater harvesting systems commonplace by clearly outlining safe installation and maintenance practices.

| May 14, 2012

Plumbing research coalition to study drainline transport issue

The effort is aimed at determining if decreasing levels of water flow­­––caused by increasingly efficient plumbing fixtures––are sufficient to clear debris from plumbing pipes.

| May 1, 2012

White paper discusses benefits of diaphragm and piston flushometer valves

The white paper highlights considerations that impact which type of technology is most appropriate for various restroom environments.

| May 1, 2012

Bruce E. Brooks Associates announces new commissioning subsidiary

Brooks + Wright Commissioning to be led by Will Wright.

| Apr 26, 2012

Blackney Hayes Architects launches new engineering division

The new division, BHH Engineers, will be led by Mark Hershman, PE.

| Jan 26, 2012

American Standard names Gould as president and CEO

Gould succeeds Don Devine, who led the successful turnaround of American Standard Brands.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Oct 6, 2011

GREENBUILD 2011: Growing green building market supports 661,000 green jobs in the U.S.

Green jobs are already an important part of the construction labor workforce, and signs are that they will become industry standard.

| Oct 5, 2011

GREENBUILD 2011: Kohler builds sustainable booth at Greenbuild 2011

In a setting composed of reclaimed materials, biodegradable signage, energy-efficient lighting and more, exhibitor highlights its new products with ecological awareness. 

boombox1 - default
boombox2 -
native1 -

More In Category


Plumbing

EPA to revise criteria for WaterSense faucets and faucet accessories

The U.S. Environmental Protection Agency (EPA) plans to revise its criteria for faucets and faucet accessories to earn the WaterSense label. The specification launched in 2007; since then, most faucets now sold in the U.S. meet or exceed the current WaterSense maximum flow rate of 1.5 gallons per minute (gpm). 



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021