flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

GE launches electric vehicle charging platform

GE launches electric vehicle charging platform

WattStation Connect provides owners a user-friendly method to manage, monitor and maintain their EV charging ecosystem network.


By By BD+C Staff | April 27, 2012
GEs WattStation pedestal EV charger is easy to use, customizable and features a
GEs WattStation pedestal EV charger is easy to use, customizable and features a retractable cord.

GE Energy’s Industrial Solutions business unveiled its new ecomagination-approved WattStation and WattStation Connect.

An electric vehicle (EV) charging station and software platform, the solution allows WattStation owners to manage charging stations remotely, giving them the ability to manage and set customer pricing for EV charging, provide access control at their facilities, generate valuable reports and engage with customers in new ways.

Now available, GE’s WattStation pedestal EV charger is easy to use, customizable and features a retractable cord.

The WattStation Connect full-service software platform helps meet a wide variety of EV needs, whether it is a retailer looking to attract new customers, a commercial property manager in need of information on electricity usage or a fleet owner in search of better cost-allocation data. WattStation Connect provides owners a user-friendly method to manage, monitor and maintain their EV charging ecosystem network.

Industrial Solutions is forming data acquisition agreements with key navigation companies to share information on the installations and availability of WattStations throughout the U.S. and Canada. This enables EV drivers to view and locate GE’s WattStations, obtain directions to the EV charging stations, access pricing details and determine whether a unit is available for charging. In addition to global positioning systems, the GE WattStation Connect data will be available through the Internet, mobile app/device and future in-vehicle systems.

GE Energy’s Industrial Solutions business is working with a well-known online payment company to enable drivers to safely and conveniently pay for charging fees through the WattStation Connect mobile app. The app will be available for download in the coming weeks. EV drivers can use the mobile app to scan the quick response (QR) barcode on the WattStation charger. The QR code will identify the station and the pricing structure for that individual charger. BD+C

Related Stories

| Aug 11, 2010

Special Recognition: Kingswood School Bloomfield Hills, Mich.

Kingswood School is perhaps the best example of Eliel Saarinen's work in North America. Designed in 1930 by the Finnish-born architect, the building was inspired by Frank Lloyd Wright's Prairie Style, with wide overhanging hipped roofs, long horizontal bands of windows, decorative leaded glass doors, and asymmetrical massing of elements.

| Aug 11, 2010

Giants 300 Index and  Methodology

BD+C's annual Giants 300 list consists of U.S. firms that designed or constructed the largest volume of commercial, institutional, industrial, and multifamily residential buildings in 2008. Each spring, the editors survey the country's largest firms, ranking the top 300 across six categories: architects, architect/engineers, engineers, engineer/architects, contractors, and construction managers.

| Aug 11, 2010

The pride of Pasadena

As a shining symbol of civic pride in Los Angeles County, Pasadena City Hall stood as the stately centerpiece of Pasadena's Civic Center since 1927. To the casual observer, the rectangular edifice, designed by San Francisco Classicists John Bakewell, Jr., and Arthur Brown, Jr., appeared to be aging gracefully.

| Aug 11, 2010

Education's Big Upgrade

Forty-five percent of the country's elementary, middle, and high schools were built between 1950 and 1969 and will soon reach the end of their usefulness, according to the 2005–2008 K-12 School Market for Design & Construction Firms, published by ZweigWhite, a Massachusetts-based market-research firm.

| Aug 11, 2010

Great Solutions: Technology

19. Hybrid Geothermal Technology The team at Stantec saved $800,000 in construction costs by embedding geothermal piping into the structural piles at the WestJet office complex in Calgary, Alb., rather than drilling boreholes adjacent to the building site, which is the standard approach. Regular geothermal installation would have required about 200 boreholes, each about four-inches in diameter ...

boombox1 - default
boombox2 -
native1 -

More In Category




Plumbing

EPA to revise criteria for WaterSense faucets and faucet accessories

The U.S. Environmental Protection Agency (EPA) plans to revise its criteria for faucets and faucet accessories to earn the WaterSense label. The specification launched in 2007; since then, most faucets now sold in the U.S. meet or exceed the current WaterSense maximum flow rate of 1.5 gallons per minute (gpm). 

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021