flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Gafcon announces completion of Coronado animal care facility

Gafcon announces completion of Coronado animal care facility


By BD+C staff | August 11, 2010

Coronado Animal Care Facility

Gafcon Inc., a leading California-based construction management and consulting firm, announced today that construction is now complete on a new $1.6 million animal care facility located at 1395 First Street in Coronado, Calif.

Gafcon performed a constructability review and served as the construction manager for the 12-month project for the City of Coronado. The project involved the demolition of an existing parking lot adjacent to the Coronado Ferry Landing Marketplace and construction of a new 3,400-square-foot single-story concrete masonry building. The facility houses a variety of functional spaces including seven dog adoption areas, three cat community rooms, holding areas, quarantine areas, examination/treatment area, "get acquainted" room, food preparation space, grooming room and exterior dog exercise yard.

The facility was built to the U.S. Green Building Council's LEED Silver certification standards, incorporating a variety of sustainable elements including energy- and water-efficient fixtures, natural lighting, recycled building materials and construction waste recycling.

The new building reduces the environmental impact due to its proximity to public transportation, off-street parking for fuel-efficient vehicles, permeable concrete pavers and an infiltration system to reduce storm water runoff. The facility also reduces its potable water consumption through the use of water-efficient landscaping and artificial turf. The exterior masonry block walls utilized in the structure have a high recycled content and 50 percent of all wood products used are Forest Stewardship Council certified. The interior finishes all meet or exceed the standards for lowering indoor air contaminant levels and mechanical systems were flushed out prior to occupancy to further reduce volatile organic compounds. The project design also included multiple clerestory windows and skylights to optimize natural light and further reduce energy consumption.

The Gafcon project team included John Wilson, project manager; Penny Kronberg, constructability review/oversight; Anthony Trinca, constructability review; and Jamie Roberts, labor compliance.

Other members of the project team included Bill Cecil, capital projects manager for the City of Coronado; Davy Architecture, architect; Grahovac Construction, general contractor; Stedman Dyson, structural engineer; SB&O, civil engineer; Turpin & Rattan Engineering, electrical engineer; Rao Engineers, mechanical engineer; and Howard Associates, landscape architect.

The project was developed as the result of a joint-funding agreement between the City of Coronado and Pacific Animal Welfare Society, or PAWS, of Coronado. The previous shelter located on Orange Avenue was torn down to make way for senior housing units in 2006. Since that time, animal services have been housed in the basement of the Coronado Police Department.

The City of Coronado has retained Gafcon to provide construction management for a second project, the new Coronado Tennis Center.

About Gafcon Inc.
Founded in 1987 by Pam and Yehudi Gaffen, Gafcon Inc. is a leading development and construction management firm providing professional construction consulting, construction program management, real estate economics consulting, design management and construction-related claims support. The company employs more than 150 construction project managers architects, civil engineers, financial analysts, estimators, schedulers, quality inspectors and computer professionals. Gafcon maintains corporate headquarters in downtown San Diego, with branch offices in Irvine, Los Angeles and Oregon.

Related Stories

| Sep 19, 2013

What we can learn from the world’s greenest buildings

Renowned green building author, Jerry Yudelson, offers five valuable lessons for designers, contractors, and building owners, based on a study of 55 high-performance projects from around the world.

| Aug 2, 2013

Design of world’s tallest wood skyscraper would be more sustainable than steel alternative

Architecture firm C. F. Møller has proposed building the tallest wooden building in the world in Stockholm, Sweden. 

| Jul 26, 2013

LEED V4 includes controversial cradle-to-cradle materials provision

Cradle to Cradle certification, a strict assessment of the environmental qualities of materials used in green buildings, is a controversial provision in LEED V4.

| Jul 1, 2013

Firestone Building Products Company LLC Announces Sustainability Report

Firestone Building Products Company, LLC, the leading manufacturer of superior “Roots to Rooftops” products for commercial building performance solutions, today announced the release of its 2012 Sustainability Report. The report, the first for Firestone Building Products Company, covers the fiscal 2012 year and is available for download at firestonebpco.com.

| Jun 5, 2013

USGBC: Free LEED certification for projects in new markets

In an effort to accelerate sustainable development around the world, the U.S. Green Building Council is offering free LEED certification to the first projects to certify in the 112 countries where LEED has yet to take root.

| May 17, 2013

LEED v4 has provision to reduce water use in cooling towers

The next version of the U.S. Green Building Council's LEED rating system will expand water-savings targets to appliances, cooling towers, commercial kitchen equipment, and other areas.

| May 14, 2013

Paints and coatings: The latest trends in sustainability

When it comes to durability, a 50-year building design ideally should include 50-year coatings. Many building products consume substantial amounts of energy, water, and petrochemicals during manufacture, but they can make up for it in the operations phase. The same should be expected from architectural coatings.

| May 3, 2013

5 common failures in paints and coatings

As experienced designers, contractors, and owners know, most paint and coating problems are correctable, but some are especially stubborn to address. Here is a partial compendium of typical failure modes and methods for addressing the problem.

| Mar 21, 2013

Best Firms to Work For: Enermodal Engineering is green to the core

At Enermodal Engineering, there’s only one kind of building—a sustainable one.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021