flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

First large-scale use of perovskite solar cells in office building slated for Poland this year

Codes and Standards

First large-scale use of perovskite solar cells in office building slated for Poland this year

Skanska will integrate the technology into building facades.


By Peter Fabris, Contributing Editor | January 31, 2018

Skanska’s commercial development business unit in Central Eastern Europe says it will be the first developer to cover office buildings with semi-transparent perovskite solar cells on a commercial scale.

Perovskites are crystalline materials that have great potential to replace silicon in solar power generation. Skanska will apply the technology, developed by Saule Technologies, onto its projects in 2018.

This will be a significant milestone towards zero-energy and carbon neutral office buildings, Skanska says. The company says that the stability and water resistance of the modules makes them ideal for the construction industry.

“Our modules are lighter, thinner, and much more design-friendly than the most popular silicon solar cells,” says Olga Malinkiewicz, co-founder and CTO at Saule Technologies. “We may customize the shape, color, and size of the module depending on the needs of the customer and install them wherever there is a free area on the building.”

Related Stories

| Jul 12, 2012

OSHA launches campaign to prevent heat illness

The Occupational Safety and Health Administration has launched its 2012 Heat Illness Prevention Campaign to educate employees and their employers about the hazards of working outdoors in heat, and how to prevent heat-related illnesses.

| Jul 12, 2012

Contractors have increasing concerns over new federal hiring quotas

A proposed rule by the U.S. Department of Labor's Office of Federal Contract Compliance Programs to increase disabled- and veteran-worker hiring quotas for federal contractors continues to raise deep concerns among contractors.

| Jul 5, 2012

Veterans Administration threatens to pull contract on new Orlando medical center

The Veterans Administration asked contractor Brasfield & Gorrie to get more workers on the job and figure out a way to get the job done faster, or the VA would pull the contract on the much-delayed Orlando VA Medical Center.

| Jul 5, 2012

Cost to contractors for new federal hiring quotas much higher than estimated, AGC says

Administration officials significantly underestimated the cost to construction employers of proposed new hiring quotas for federal contractors, according to analysis by the Associated General Contractors of America.

| Jul 5, 2012

Roof membrane could have prevented roof parking deck collapse, specialist says

The collapse of a section of a roof parking deck at the Algo Centre Mall in Elliot Lake in Ontario, Canada could have been prevented if the structure had a membrane, according to a concrete expert and specialist in structure analysis at McMaster University.

| Jul 5, 2012

New Joplin, Mo. hospital being built to withstand tornado that destroyed predecessor

After the May 22, 2011, EF-5 tornado destroyed St. John’s Regional Medical Center in Joplin, Mo., architects and engineers analyzed how the nine-story structure reacted to the storm.

| Jul 5, 2012

Continued tax breaks necessary for widespread adoption of net zero buildings

Tax breaks passed by the U.S. government to encourage construction of green buildings are set to expire in 2012 and 2013.

| Jun 28, 2012

Six buildings now recognized under Living Building Challenge

The Living Building Challenge (LBC), a green ratings system for design and construction that judges a building based on its actual performance, not just its projected performance at the design stage, has recognized six buildings to date.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021