flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

First international buildings among 700-plus certified by BOMA 360 Performance Program

First international buildings among 700-plus certified by BOMA 360 Performance Program

Program now in place in 60 global markets


By BD+C Staff | April 18, 2014
The Aon Center in Chicago was first designated a BOMA 360 building in 2010. Phot
The Aon Center in Chicago was first designated a BOMA 360 building in 2010. Photo: Photogal via Wikimedia Commons

In the first quarter of 2014, the Building Owners and Managers Association (BOMA) International certified 66 properties in the BOMA 360 Performance Program for commercial real estate markets across the U.S and, for the first time, abroad. The Hongo Segawa Building in Tokyo and Bankers Hall and the Exchange Tower in Canada were the first such properties to achieve certification outside of the U.S.

The BOMA 360 Program has expanded to nearly 60 markets worldwide. It evaluates commercial properties in six major areas: building operations and management; life safety/security/risk management; training and education; energy; environment/sustainability; and tenant relations/community involvement. Since the program’s inception in 2009, more than 700 commercial properties demonstrating best practices in these areas have earned the BOMA 360 label.

Several surveys and studies have found that buildings with the BOMA 360 label have higher tenant retention and satisfaction scores, higher rental rates, and documented operations and management savings and efficiencies, BOMA says.

(http://www.BOMA-360-Performance-Program-Designates-First-Buildings-in-Canada-and-Japan.aspx)

Related Stories

| Aug 11, 2010

200 Fillmore

Built in 1963, the 32,000-sf 200 Fillmore building in Denver housed office and retail in a drab, outdated, and energy-splurging shell—a “style” made doubly disastrous by 200 Fillmore's function as the backdrop for a popular public plaza and outdoor café called “The Beach.

| Aug 11, 2010

Integrated Project Delivery builds a brave, new BIM world

Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.

| Aug 11, 2010

Inspiring Offices: Office Design That Drives Creativity

Office design has always been linked to productivity—how many workers can be reasonably squeezed into a given space—but why isn’t it more frequently linked to creativity? “In general, I don’t think enough people link the design of space to business outcome,” says Janice Linster, partner with the Minneapolis design firm Studio Hive.

| Aug 11, 2010

Great Solutions: Products

14. Mod Pod A Nod to Flex Biz Designed by the British firm Tate + Hindle, the OfficePOD is a flexible office space that can be installed, well, just about anywhere, indoors or out. The self-contained modular units measure about seven feet square and are designed to serve as dedicated space for employees who work from home or other remote locations.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021