flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Fire-rated glass separation helps merge new and old pools into a single connected aquatics center

Sponsored Content

Fire-rated glass separation helps merge new and old pools into a single connected aquatics center

Clear fire-rated glazing helps create a light-filled, safe space for student athletes and spectators in Niles, Illinois


By Technical Glass Products | May 11, 2015
Fire-rated glass separation helps merge new and old pools into a single connected aquatics center

Clear fire-rated glazing transfers daylight. Image courtesy of TGP.

Ancient philosophers theorized four elements comprised the universe: earth, air, water and fire. The latter two of these figure prominently in the design of the Niles North High School Aquatics Center in Skokie, Il., a suburb of Chicago.

On behalf of its client, the Niles Township High School District 219, Legat Architects (Chicago) designed an “expansion and renovation of the aquatics center to improve competitive and educational swimming programs, promote community participation and enhance safety.”

Designed to meet LEED for Schools Gold environmental criteria, a key aspect of the project was a 24,600-sf addition to the school’s existing pool complex. The addition’s defining visual features include a dramatically curving roof with clerestory over the new pool, and a glazed curtain wall rising up to match the roof’s curve. The light-filled space creates the ambiance of an outdoor pool for student athletes and spectators.

While the water element is clear in the swimming pools, the fire element factors in with the use of fire-rated glazing systems from Technical Glass Products (TGP).

“We needed to provide a two-hour fire-rated separation between the existing building and the new addition, but we wanted the facility to read as a single aquatics center,” explained Michael Maloney, LEED AP BD+C, design director for Legat Architects. “A visual connection between pools was crucial for the concept, as well as for safety and security. The Fireframes¼ Curtainwall Series frames and Pilkington Pyrostop¼ glass from TGP allowed us to meet the fire requirements, while maintaining the visual connection between the existing and new parts of the building.”


TGP’s Fireframes¼ Curtainwall Series frames
 

Fireframes Curtainwall Series frames are available with fire-ratings up to 120 minutes, and feature narrow profiles to reduce sightlines. The UL classified and labeled steel frames enable large, multi-story expanses of glass in interior and exterior applications. Also available with up to 120 minute fire ratings, Pilkington Pyrostop glazing is impact safety rated and blocks the transfer of radiant heat.

For more information on the Fireframes Curtainwall System and Pilkington Pyrostop, along with TGP’s other fire-rated glass and framing, visit www.fireglass.com. 

 

Technical Glass Products 

800.426.0279
800.451.9857 – fax
sales@fireglass.com
www.fireglass.com

Related Stories

K-12 Schools | Aug 13, 2021

A new P3 guide for K-12 school construction is released

This alternative financing isn’t a silver bullet, but it does provide options to cash-strapped districts.

Contractors | Jul 23, 2021

The aggressive growth of Salas O'Brien, with CEO Darin Anderson

Engineering firm Salas O'Brien has made multiple acquisitions over the past two years to achieve its Be Local Everywhere business model. In this exclusive interview for HorizonTV, BD+C's John Caulfield sits down with the firm's Chairman and CEO, Darin Anderson, to discuss its business model.

K-12 Schools | Jul 9, 2021

LPA Architects' STEM high school post-occupancy evaluation

LPA Architects conducted a post-occupancy evaluation, or POE, of the eSTEM Academy, a new high school specializing in health/medical and design/engineering Career Technical Education, in Eastvale, Calif. The POE helped LPA, the Riverside County Office of Education, and the Corona-Norco Unified School District gain a better understanding of which design innovations—such as movable walls, flex furniture, collaborative spaces, indoor-outdoor activity areas, and a student union—enhanced the education program, and how well students and teachers used these innovations.

K-12 Schools | Jun 29, 2021

A Maryland school system launches a P3 program to speed up K-12 school design, financing, and construction

Gilbane and Stantec are part of a consortium that breaks ground on six new schools this week.

Resiliency | Jun 24, 2021

Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]

New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.

K-12 Schools | Jun 20, 2021

Los Angeles County issues design guidelines for extending PreK-12 learning to the outdoors

The report covers everything from funding and site prep recommendations to whether large rocks can be used as seating.

Wood | Jun 10, 2021

Three AEC firms launch a mass timber product for quicker school construction

TimberQuest brand seeks to avoid overinvestment in production that has plagued other CLT providers.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

Daylighting | Mar 7, 2021

Texas intermediate school lets the sun really shine in

Solatube tubular daylighting devices bring sunlight into the two-story commons/media space for 600 students in grades 3-5 at Sunnyvale Intermediate School.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â