The Exploratorium’s tall order

The Exploratorium’s tall order

SAFTI FIRST helps iconic San Francisco museum achieve desired glass heights using SuperLite II-XL 45


By SAFTI FIRST | August 23, 2013
11 pairs of SuperLite II-XL 45 IGU in HM Door Framing was used in the buildings
11 pairs of SuperLite II-XL 45 IGU in HM Door Framing was used in the buildings north side. SAFTI FIRST was able to achieve the desired glass heights, and was less expensive than other options, says Katherine Miller of EHDD.

Editor's note: This is a sponsored article. All text and images were provided by the sponsor company.

 

 

Project name:  The Exploratorium in San Francisco
Architect:  EHDD
General Contractor:  Nibbi Brothers General Contractors
Glazing Contractor:  Architectural Glass and Aluminum
Products used:  SuperLite II-XL 45 IGU in SAFTIfire HM Framing

The newly-opened Exploratorium has brought energy and excitement to the city’s bustling waterfront.  EHDD transformed the historic Pier 15, built in 1915, to a 330,000 square foot indoor and outdoor campus, being touted as the largest net-zero building in the city and potentially the largest net-zero museum in the world.

EHDD kept the original structure and concrete cladding of the building but removed most of the loading dock doors on the north and south sides of the pier, replacing them with glazed door assemblies in order to bring in natural light and provide convenient access between the inside space and the outdoor exhibits.  By using glass, the architects were also able to make a connection to the outdoors, with the south side offering views of the Bay Bridge and north side offering views of the San Francisco skyline – putting the city itself and its iconic landmarks on display.

However, the location of the Exploratorium’s new home posed a unique challenge.   “The exterior portions of the piers are designed to function similar to rated interior egress corridors in the event of a fire,” says Katherine Miller, the project architect for the Exploratorium.  Not wanting to sacrifice daylight and views, the designers opted to use fire rated glass for the exterior doors so that people evacuating the site via the piers will be protected in case a fire breaks out from inside the building.

SAFTI FIRST supplied a total of 19 pairs of 45-minute steel doors – 11 pairs on north side and 8 pairs on the south side – using SuperLite II-XL 45 IGU in SAFTIfire HM Framing.  The SuperLite II-XL 45 glazing was insulated with tempered low-e glazing on the #2 surface for energy efficiency.  The frames were painted to match the adjacent non-rated systems.  

 

8 pairs of SuperLite II-XL 45 IGU in HM Door Framing on the south side provides easy access to the outdoor exhibits and views of the Bay Bridge.

 

SuperLite II-XL 45 is a clear, fire resistive glazing product tested to ASTM E-119/NFPA 251/UL 263 with hose stream and meets NFPA 252/257 for use in door and window assemblies.  It meets CPSC Cat. II impact safety and is available in large sizes, which was critical because some of the doors had a day light opening of 97 inches high.  

“SAFTI FIRST was able to achieve the desired glass heights, and was less expensive than other options,” adds Katherine.  SuperLite II-XL 45 has the largest sizes for clear 45 minute fire and safety rated glazing, with a maximum clear view area of 4,952 square inches and a maximum clear view height or width 124 inches.  It is made here in the USA at SAFTI FIRST’s manufacturing facility in California, ensuring competitive pricing versus fire resistive multilaminates or fire protective filmed or laminated ceramics, which are either imported from Europe of Asia.

Aside from large sizes and competitive pricing, SuperLite II-XL 45 was chosen because “it was a good color match to the adjacent clear low-e coated glass,” says Katherine.  SuperLite II-XL 45 has superior optical clarity and does not have any amber tints typically seen in fire rated ceramics.

Further expansion is planned for the neighboring Pier 17.  For now, inquisitive minds of any age can satisfy their curiosities at the Exploratorium’s new spectacular – and safe – space along the embarcadero. 

Related Stories

Building Materials | Aug 3, 2022

Shawmut CEO Les Hiscoe on coping with a shaky supply chain in construction

BD+C's John Caulfield interviews Les Hiscoe, CEO of Shawmut Design and Construction, about how his firm keeps projects on schedule and budget in the face of shortages, delays, and price volatility.

Building Materials | Jun 20, 2022

Early-stage procurement: The next evolution of the construction supply chain

Austin Commercial’s Jason Earnhardt explains why supply chain issues for the construction industry are not going to go away and how developers and owners can get ahead of project roadblocks.

Sponsored | BD+C University Course | May 3, 2022

For glass openings, how big is too big?

Advances in glazing materials and glass building systems offer a seemingly unlimited horizon for not only glass performance, but also for the size and extent of these light, transparent forms. Both for enclosures and for indoor environments, novel products and assemblies allow for more glass and less opaque structure—often in places that previously limited their use.

Sponsored | Glass and Glazing | Oct 27, 2021

Treating Glass as a Canvas

In the world of fine art, a master painter begins with canvas selection. A linen canvas is nearly always selected over cotton because nothing delivers the artist’s authentic vision quite like linen. Similarly, with glass.

Sponsored | Glass and Glazing | Oct 27, 2021

True Clarity for Ambitious Design

Clear glass is extremely common and is popular for a variety of architectural design applications, including vision glass, spandrel glass, storefronts, entryways and other exterior uses. It is specified repeatedly due to its versatility and ability to serve as a substrate for solar control, low-emissivity (low-E) coatings. However, when specifying glass to achieve a desired aesthetic, design professionals know that clear glass isn’t completely clear.

Glass and Glazing | Oct 26, 2021

Façade design for cost, performance, and delivery [AIA course]

HOK Technical Principal David Frey outlines best practices for designing building envelopes that live up to the aesthetic vision of the project while being cost-effective, high-performing, and quick to install.

Fire-Rated Products | Oct 21, 2021

Safti First Fights Through Assertions Made By Plaintiffs Ely Holdings Limited And Greenlite Glass Systems That Safti First’s Fire Rated Floor System Infringed On Their Patent

In a summary judgement dated February 3, 2021, Chief Magistrate Joseph C. Spero of the United States District Court for the Northern District of California ruled that the patent infringement claims filed by Ely Holdings Limited (Ely) and Greenlite Glass Systems (Greenlite) against SAFTI FIRST, a USA fire rated glass and framing manufacturer, could not proceed to trial, finding that the SAFTI FIRST’s fire resistant floor does not violate Ely’s patent.

Sponsored | Glass and Glazing | Oct 1, 2021

Specifying Responsibly to Save Birds’ Lives

Realizing sustainable, bird-friendly glass design

Sponsored | Glass and Glazing | Oct 1, 2021

Seizing the Daylight with BIPV Glass

Glass has always been an idea generator. Now, it’s also a clean energy generator.

boombox1 - default
boombox2 -
native1 -

More In Category



Glass and Glazing

Vitro Architectural Glass Lowers Embodied Carbon Further, Releases NEW Environmental Product Declarations

Vitro Architectural Glass (formerly PPG Glass) has published updated versions of its Environmental Product Declarations (EPDs) for both flat and processed glass. These updates reaffirm that Vitro’s glass products contain less embodied carbon than the industry standard for architectural glass products and indicate a lower embodied carbon value than previously reported in 2017 editions of these EPDs.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021