Duro-Last provides solution for Kentucky elementary school's leaky roof

Sponsored Content Roofing

Duro-Last provides solution for Kentucky elementary school's leaky roof

The assembly used for this project was Duro-Guard EPS Flute Fill Combo as the base, and then Duro-Guard ISO HD and DensDeck® cover boards. 


By Duro-Last | March 21, 2017

Contractor: JBK Roofing

Project: Lynn Camp Elementary School

Location: Corbin, Kentucky

Square Feet: 119,000

Products: Duro-Fleece®, Duro-Tuff® and Duro-Last® membranes; Vinyl Ribs; Duro-Guard® EPS Flute Fill Combo insulation; Duro-Guard ISO HD insulation, Duro-Guard DensDeck® cover boards, EXCEPTIONAL® Metals accessories and edge details, Duro-Grip® CR-20 adhesive; Duro-Caulk® Advanced

 

 

When roof leaks were starting to interfere with the daily activities of Lynn Camp Elementary School in Corbin, Kentucky, administrators knew it was time for a new roof.

“We had a situation in a lot of the rooms where tiles were molding because of the roof leaks,” said Anthony Pennington, Principal of Lynn Camp Schools. “It was becoming a constant distraction for not only our students but our teachers and their learning process.”

The existing standing seam metal section of the roof was a daunting task at more than 78,000 square feet, but its design and blue color was a look the school was hoping to maintain. However, the projected timeline to complete a metal roof of this size would be 9-12 months, well outside the school’s needs.

Time was of the essence for this project and when JBK Roofing presented a metal retrofit option using the Duro-Last Vinyl Rib system, school administrators knew they had found the right solution.

The assembly used for this project was Duro-Guard EPS Flute Fill Combo as the base, and then Duro-Guard ISO HD and DensDeck® cover boards. Duro-Fleece 50 mil membrane was adhered with Duro-Grip CR-20 adhesive and, lastly, the Vinyl Ribs were heat welded to the adhered membrane.

Being such a large roof, more than 52,000 liner feet of Vinyl Rib was used.

“This is by far the largest and most intense Vinyl Rib project we’ve done,” said Brandon Keck, President of JBK Roofing. “Even so, the Duro-Last system was extremely fast-paced and allowed us to fit in the school’s schedule, taking only 90 days to complete.”

The bright blue color of the Duro-Fleece membrane also gave the school the aesthetic look they wanted. “We wanted something cutting edge, we wanted something that would last a long time and would look amazing for our school,” Pennington said.

Related Stories

Sponsored | Roofing | May 9, 2016

The incredible long-lived metal roof

A report by the Metal Construction Association (MCA) found that 55% Al-Zn coated low-slope steel standing seam roofing systems suffer very little corrosion if properly maintained. 

Roofing | Feb 24, 2016

Better membranes, better roofing [AIA course]

To earn 1.0 AIA CES HSW learning units, study the article carefully and take the exam.

Codes and Standards | Jan 22, 2016

Metal Roofing Seaming Guide published by Metal Construction Association

The free document is specifically tailored for metal roof installation.

Sponsored | Roofing | Oct 28, 2015

WeatherXL™ Crinkle finish brings visual depth to projects

A textured finish enhances visual depth and adds a richness to color

Roofing | Oct 27, 2015

Hoboken, N.J.,promotes green roofs by easing approval process

Mayor wants to offer tax incentives as further enticement.

Sponsored | Coatings | Sep 25, 2015

Comfort and energy efficiency with cool metal roofs

Energy-efficient metal roofs, with cool coatings are at the forefront of innovation, helping to increase the efficiency of the building envelope. 

Sponsored | Metals | Jun 23, 2015

Metal Roof Retrofits: the potential, the problems, the payoff, part 1

For the best possible outcomes when working on metal roof retrofits, consider some simple but vital steps to get the best possible outcome from your retrofit job. 

Sponsored | Roofing | May 11, 2015

How architects can tap into the expertise of their metal roof manufacturer, part 2

Here are three things metal roof manufacturers can do to help the architect

Sponsored | Metals | Apr 24, 2015

Are metal roofs lightning magnets?

According to The Metal Construction Assocition, a metal roof will not make lightning more likely to strike, but it may make a lightning strike less dangerous if it occurs. That’s right, less dangerous, not more.

Sponsored | Roofing | Apr 15, 2015

Curved metal panels allow for community college expansion

A new campus was needed to support an Ohio community college's expanding population

boombox1 - default
boombox2 -
native1 -

More In Category


Standards

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021