flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Duke’s new Chinese campus sits atop a manmade lake

University Buildings

Duke’s new Chinese campus sits atop a manmade lake

Gensler and LandDesign designed the project.


By David Malone, Associate Editor | July 3, 2019

All images courtesy LandDesign

As part of Duke University’s 200-acre global campus in Kunshan, China, the 30-acre first phase of Duke Kunshan University Campus includes five buildings that sit atop a manmade lake and are interconnected by low bridges and seasonal plazas.

The plazas are submerged underneath the water and are only revealed and usable during periods of low rainfall, which coincides with peak student attendance. A four-acre water ecosystem is the central landscape element of the new campus and includes a stormwater management system with point-source water filtration, roof gardens, rain gardens, living water gardens, greywater capture, and aquatic habitat creation.

 

 

"The entire water filtration system serves as an ecological education lab with a flowing water garden located at the end,” said Kevin Vogel, PE, Partner and Civil Engineer with LandDesign, in a release. "The design also addresses scalable energy alternatives to correspond with the American College & University President’s Climate Commitment for carbon neutrality.”

Primary gathering spaces feature movable benches, planters, and sculptures in order to accommodate large events, art installations, and social/learning space. Gensler is the project’s architect while LandDesign is handling landscape architecture and civil engineering duties.

 

 

Related Stories

| Jan 19, 2012

BOKA Powell-designed facility at Texas A&M Bryan campus

The new facility provides programs for the Texas A&M Health Science Center, the Texas Brain and Spine Institute, Mary Crowley Cancer Research Centers, and Blinn College Allied Health programs.

| Jan 4, 2012

Shawmut Design & Construction awarded dorm renovations at Brown University

Construction is scheduled to begin in June 2012, and will be completed by December 2012.

| Jan 3, 2012

New Chicago hospital prepared for pandemic, CBR terror threat

At a cost of $654 million, the 14-story, 830,000-sf medical center, designed by a Perkins+Will team led by design principal Ralph Johnson, FAIA, LEED AP, is distinguished in its ability to handle disasters. 

| Dec 20, 2011

Gluckman Mayner Architects releases design for Syracuse law building

The design reflects an organizational clarity and professional sophistication that anticipates the user experience of students, faculty, and visitors alike. 

| Dec 19, 2011

HGA renovates Rowing Center at Cornell University

Renovation provides state-of-the-art waterfront facility.

| Dec 16, 2011

Goody Clancy-designed Informatics Building dedicated at Northern Kentucky University

The sustainable building solution, built for approximately $255-sf, features innovative materials and intelligent building systems that align with the mission of integration and collaboration. 

| Dec 5, 2011

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.

| Dec 2, 2011

Goody Clancy awarded Ohio State residential project

The project, which is focused on developing a vibrant on-campus community of learning for OSU undergraduates.

| Nov 23, 2011

Griffin Electric completes Gwinnett Tech project

Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.

boombox1 - default
boombox2 -
native1 -

More In Category

Mass Timber

Mass timber a big part of Western Washington University’s net-zero ambitions

Western Washington University, in Bellingham, Wash., 90 miles from Seattle, is in the process of expanding its ABET-accredited programs for electrical engineering, computer engineering and science, and energy science. As part of that process, the university is building Kaiser Borsari Hall, the 54,000-sf new home for those academic disciplines that will include teaching labs, research labs, classrooms, collaborative spaces, and administrative offices.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021