flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Despite dip, architecture billings remain strong

Architects

Despite dip, architecture billings remain strong

The American Institute of Architects (AIA) reported the July ABI score was 54.7, down a point from a mark of 55.7 in June. 


By AIA | August 19, 2015
Despite dip, ABI remains strong

Photo: King of Prussia Mall in Lafayette Park, Penn. Montgomery County Planning Commission/Creative Commons.

The Architecture Billings Index (ABI) reflects sustained demand for design services in nearly all nonresidential project types over the nine to twelve month lead time between architecture billings and construction spending.

The American Institute of Architects (AIA) reported the July ABI score was 54.7, down a point from a mark of 55.7 in June. This score still reflects an increase in design services (any score above 50 indicates an increase in billings).

The new projects inquiry index was 63.7, up slightly from a reading of 63.4 the previous month.

“On top of what has been a flurry of design activity in recent months, some architects are reporting a break in the logjam created by clients placing projects on hold for indefinite periods, which bodes well for business conditions in the months ahead,” said AIA Chief Economist Kermit Baker, Hon. AIA, PhD. “There is some uneasiness in the design community that rapid growth in construction costs could escalate beyond development capital and municipal budgets, which could trigger some contraction in the marketplace down the road.”

July ABI highlights:

  • Regional averages: Midwest (58.2), South (55.7), West (53.8) Northeast (53.5)
  • Sector index breakdown: institutional (57.3), mixed practice (56.8), commercial/industrial (53.4) multi-family residential (49.8)
  • Project inquiries index: 63.7
  • Design contracts index: 54.5

The regional and sector categories are calculated as a three-month moving average, whereas the national index, design contracts and inquiries are monthly numbers.

Related Stories

| Nov 16, 2011

Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.

This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.

| Nov 16, 2011

Architecture Billings Index moves upward

The Architecture Billings Index climbed nearly three points in October. 

| Nov 16, 2011

CRSI recommends return to inch-pound markings

The intention of this resolution is for all new rollings of reinforcing steel products to be marked with inch-pound bar markings no later than January 1st, 2014. 

| Nov 16, 2011

John Patelski joins Ghafari as executive vice president

As executive vice president, Patelski will be responsible for expanding the firm’s services in new strategic markets.

| Nov 15, 2011

Struggling economy demands construction industry embrace enterprise-wide risk management

In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

| Nov 14, 2011

Summit Design+Build selected at GC for new Office Concepts headquarters

The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. 

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021