flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Design competition: $900,000 on the line in Las Vegas revitalization challenge

Design competition: $900,000 on the line in Las Vegas revitalization challenge

Las Vegas Mayor Carolyn Goodman wants your economic development ideas for remaking four areas within the city, including the Cashman Center and the Las Vegas Medical District.


By Las Vegas SC2 Challenge | May 7, 2014

In Las Vegas, the concept of awarding significant cash prizes for innovative and effective economic development solutions makes sense. The city recently launched its Strong Cities, Strong Communities (SC2) Challenge to do just that: tap the global design, architecture, land planning, and economic development community for the best economic development ideas.

Federally funded by a $1 million grant from the U.S. Department of Commerce’s Economic Development Administration, SC2 is an international prize competition awarded in 2012 to three U.S. cities: Las Vegas; Greensboro, N.C.; and Hartford, Conn. 

In Las Vegas, the competition can award up to $900,000 in prizes for transformational economic development plans to help revitalize four targeted areas within the city: Cashman Center, the Las Vegas Medical District, business parks and existing Redevelopment projects.

"Participating in the Strong Cities, Strong Communities Challenge is exciting for our city,” said Las Vegas Mayor Carolyn G. Goodman. “Las Vegas is known for its big, larger-than-life personality, so seeking big, out-of-the-box ideas is right in sync with our culture. We consider it a privilege to tap into the best and brightest minds globally and look forward to receiving some exciting, dynamic and innovative plans that will help specific areas of our city thrive and grow.”

The city is reaching far and wide to solicit the most qualified multidisciplinary teams in the fields of land planning, urban design, and other related fields to participate in this SC2 Challenge. The list of potential candidates includes leading professional firms as well as student teams from universities locally, regionally, and globally.

Winning plans must match Las Vegas’s needs, offer a feasible roadmap toward implementation, and represent innovative perspectives on economic development. The competition is divided into two phases.

During phase one, multidisciplinary teams submit economic vision proposals to the city for one of the four target areas. The top three proposals, as scored by members of an independent evaluation panel, will be submitted to the Las Vegas City Council to approve the receipt of cash prizes of $60,000 (1st place), $30,000 (2nd place), and $10,000 (3rd place), respectively. They and any other selected finalists will advance to phase two.

In phase two, finalists’ ideas will be expanded into comprehensive economic development plans for formal presentation and review by an esteemed panel of independent judges. Winners may receive cash prizes totaling up to $800,000 with a grand prize of $500,000.

Deadline to register for the Las Vegas SC2 Challenge is July 24. Phase one winners will be announced in November 2014, and phase two winners will be selected in May 2015. 

Related Stories

Standards | Apr 22, 2024

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.

Building Materials | Apr 22, 2024

Tacoma, Wash., investigating policy to reuse and recycle building materials

Tacoma, Wash., recently initiated a study to find ways to increase building material reuse through deconstruction and salvage. The city council unanimously voted to direct the city manager to investigate deconstruction options and estimate costs. 

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021