flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Des Moines University begins construction on new 88-acre campus

University Buildings

Des Moines University begins construction on new 88-acre campus

RDG Planning & Design is the design firm.


By David Malone, Associate Editor | September 10, 2020
DMU new campus

All renderings courtesy DMU

Des Moines University has broken ground on its new campus on 88 acres in West Des Moines at 8025 Grand Avenue.

The campus will include flexible environments that allow for didactic, active-learning and small group work. Learning studios and laboratories will be technology-rich while simulated health care environments will reflect those of modern care facilities, providing learners with a safe environment in which to practice patient care.

 

DMU new campus

 

Wellness and recreation facilities will allow students, faculty, and staff to stay active and healthy. An integrated student clinic will provide access to care for students to maintain a well-balanced lifestyles and a private student counseling suite ensures students have access to mental health care. The campus will also feature a mix of open and enclosed collaboration spaces that converge in the heart of the campus.

 

See Also: Performance Hall at the Taipei Music Center opens in the Nangang District

 

The entire campus has also been designed with the ability to grow and evolve over time. Flexibility will allow the university to respond to future needs in health care and health care education.

 

DMU campus outdoor space

 

In addition to RDG Planning & Design, the build team also includes Turner Construction as the general contractor.

The campus is expected to open in 2023, just in time for the school’s 125th anniversary.

 

DMU interior space

 

DMU wellness space

 

DMU campus aerial

Related Stories

| Jun 8, 2012

Chestnut Hill College dedicates Jack and Rosemary Murphy Gulati complex

Casaccio Yu Architects designed the 11,300-sf fitness and social complex.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| Jun 1, 2012

K-State Olathe Innovation Campus receives LEED Silver

Aspects of the design included a curtain wall and punched openings allowing natural light deep into the building, regional materials were used, which minimized the need for heavy hauling, and much of the final material included pre and post-consumer recycled content.

| May 31, 2012

2011 Reconstruction Award Profile: Seegers Student Union at Muhlenberg College

Seegers Student Union at Muhlenberg College has been reconstructed to serve as the core of social life on campus.

| May 31, 2012

New School’s University Center in NYC topped out

16-story will provide new focal point for campus.

| May 31, 2012

Perkins+Will-designed engineering building at University of Buffalo opens

Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1 - default
boombox2 -
native1 -

More In Category



Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021