flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Dassault Systèmes to distribute Gehry Technologies’ digital project

Dassault Systèmes to distribute Gehry Technologies’ digital project


May 16, 2011

VÉLIZY-VILLACOUBLAY, France – May 12, 2011 - Dassault Systèmes, a world leader in 3D and Product Lifecycle Management (PLM) solutions, and Gehry Technologies (GT), a technology and services provider to leading owners, developers, architects, engineers, general contractors, fabricators, and other building industry professionals worldwide, announced today that Gehry Technologies’ Digital Project products will be integrated into the Dassault Systèmes’ portfolio and distributed through Dassault Systèmes’ direct and indirect sales channels.

Digital Project is a suite of powerful 3D building information modeling (BIM) applications created by Gehry Technologies using Dassault Systèmes’ CATIA as a core modeling engine. Digital Project features design, engineering and project management in a comprehensive 3D environment specifically tailored to the architecture, engineering and construction industry. Since its inception in 2004 Digital Project has been used for some of the world’s emblematic structures, from commercial and institutional building projects to large scale infrastructure works. GT has successfully used Digital Project to address challenging design and project management issues on such landmark projects as the World Trade Center site, Beijing National Olympic Stadium, the Lincoln Center redevelopment, and the Burj Kalifa Tower, the world’s tallest building, to name a few.

This agreement allows for broader distribution of GT’s Digital Project and leads the way for Dassault Systèmes’ longer term diversification strategy to address this market while providing an opportunity for Gehry Technologies to focus on its new project delivery and Web service offerings. Leveraging advanced integrated digital design technologies, unique collaboration capabilities, deep knowledge of the industry, and dedicated services will enable construction customers to run multi-discipline parametric modeling regardless of the building project scale and complexity while allowing BIM implementations across the entire project team, including architects, structural engineers, MEP engineers, contractors and fabricators.

“Dassault Systèmes PLM solutions have been successfully deployed in manufacturing industries and we strongly believe that they can bring significant value in addressing the needs of construction companies, as demonstrated by leading construction customer projects in recent years,” said Etienne Droit, CEO, CATIA, Dassault Systèmes. “Digital Project has already proven its unique capacity to make the most complex projects in the world successful and we are thrilled to take this long-lasting partnership one step further by bringing advanced solutions specifically developed for the construction sector to our customers.”

“GT’s mission is to help architecture realize its highest ambitions: meeting the needs of clients and communities through aspiration designs that are delivered on time and on budget,” added Dennis Shelden, CTO, Gehry Technologies. “Digital Project, based on Dassault Systèmes’ CATIA, gives designers power of control, design, budget, and scheduling… We think that this agreement will accelerate the adoption of Digital Project within the construction world, enabling more innovative buildings and structures.”

About Gehry Technologies

Gehry Technologies (GT) provides design and project management technology and consulting services to leading owners, developers, architects, engineers, general contractors, fabricators, and other building industry professionals worldwide. GT solutions increase creativity and control; reduce project risks, costs, and completion times; and improve processes and decisions through collaboration, project visibility, and information access. Gehry Technologies is privately held, with offices in Los Angeles, New York, Paris, Mexico City, Abu Dhabi, Hong Kong, Shanghai, and Beijing.

About Dassault Systèmes

As a world leader in 3D and Product Lifecycle Management (PLM) solutions, Dassault Systèmes brings value to more than 130,000 customers in 80 countries. A pioneer in the 3D software market since 1981, Dassault Systèmes applications provide a 3D vision of the entire lifecycle of products from conception to maintenance to recycling. The Dassault Systèmes portfolio consists of CATIA for designing the virtual product  - DELMIA for virtual production - SIMULIA for virtual testing - ENOVIA for global collaborative lifecycle management, EXALEAD for search-based applications- SolidWorks for 3D mechanical design and 3DVIA for online 3D lifelike experiences.

Related Stories

Mass Timber | Apr 22, 2024

British Columbia changing building code to allow mass timber structures of up to 18 stories

The Canadian Province of British Columbia is updating its building code to expand the use of mass timber in building construction. The code will allow for encapsulated mass-timber construction (EMTC) buildings as tall as 18 stories for residential and office buildings, an increase from the previous 12-story limit. 

Standards | Apr 22, 2024

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.

Building Materials | Apr 22, 2024

Tacoma, Wash., investigating policy to reuse and recycle building materials

Tacoma, Wash., recently initiated a study to find ways to increase building material reuse through deconstruction and salvage. The city council unanimously voted to direct the city manager to investigate deconstruction options and estimate costs. 

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

boombox1 - default
boombox2 -
native1 -

More In Category


Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021