flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

CSI: Revitalizing the brand to achieve the mission

CSI: Revitalizing the brand to achieve the mission

An evolving organization, supporting a diverse membership, improving communication in commercial-level construction


By CSI | February 6, 2013
CSI logo
CSI logo

CSI is revitalizing its brand as part of its continued pursuit of its mission: improving facility performance through better communication in the commercial-level construction industry. CSI is focusing on creating a strong, consistent brand experience for its diverse membership with training for its leadership, new programs and products, and a new look logo and tagline.

“CSI is recognized as the only community where you can network and collaborate with building experts across the design, building materials and construction disciplines,” CSI Brand Revitalization Task Team Chair Ronald L. Geren, CSI, CCS, CCCA, said. “We connect all members of the building team to the information they need to effectively communicate and improve project delivery.”

As part of the revitalization project, CSI has introduced a new logo and tagline, which were developed to reflect CSI’s continuing evolution to meet the needs of a changing building design and construction industry. The new logo and tagline, “Building Knowledge, Improving Project Delivery,” was developed by CSI’s Brand Revitalization Task Team, a group of members and external constituents who reflect CSI’s diverse membership.

“Our new logo and tagline are a very visible step in an ongoing revitalization process,” CSI President Gregory J. Markling, FCSI, CCS, CCCA, said. “We’re offering a variety of new and updated programs and initiatives, such as our growing certification program, updated standards and formats, online practice groups, and the CSI Academies, to help industry professionals stay on top of emerging trends and best practices.”

To develop a logo and tagline consistent with CSI’s mission and values, CSI sought input from its membership, as well as external constituents, including partners and prospective members. Task team members guided the organization’s efforts throughout the process. Task Team members include:

  • Ronald L. Geren, CSI, CCS, CCCA, Brand Revitalization Task Team Chair
  • Paul R. Bertram, Jr., FCSI, CDT
  • Andrew Caruso, CDT
  • Rob Cassidy
  • Brandilyn B. Fry, CSI, CDT
  • J. Brok Howard, CSI, CDT
  • Gregory J. Markling, FCSI, CCS, CCCA
  • Casey F. Robb, FCSI, CCPR
  • David W. Vaughan, CSI, CCPR

For more information about the brand revitalization, visit www.csinet.org/brand.

About CSI
CSI is a national association dedicated to improving the documentation, management, and communication of building information as used by the construction community. CSI accomplishes its mission through the development of construction standards and formats such as MasterFormat and UniFormat; the promulgation of those formats through master guide specifications and building information management (BIM) software; training and certification programs, including the Construction Documents Technology (CDT) and Certified Construction Contract Administrator (CCCA) exams; publication of Construction Specifier magazine; and an ever-expanding membership of decision- makers who identify and specify building product solutions. CSI members include a cross-section of specifiers, architects, contractors, suppliers, and other construction project professionals who are touched by construction documentation. For more information, visit www.csinet.org, or call (800) 689- 2900.

Related Stories

| Aug 11, 2010

More construction firms likely to perform stimulus-funded work in 2010 as funding expands beyond transportation programs

Stimulus funded infrastructure projects are saving and creating more direct construction jobs than initially estimated, according to a new analysis of federal data released today by the Associated General Contractors of America. The analysis also found that more contractors are likely to perform stimulus funded work this year as work starts on many of the non-transportation projects funded in the initial package.

Museums | Aug 11, 2010

Design guidelines for museums, archives, and art storage facilities

This column diagnoses the three most common moisture challenges with museums, archives, and art storage facilities and provides design guidance on how to avoid them.

| Aug 11, 2010

Broadway-style theater headed to Kentucky

One of Kentucky's largest performing arts venues should open in 2011—that's when construction is expected to wrap up on Eastern Kentucky University's Business & Technology Center for Performing Arts. The 93,000-sf Broadway-caliber theater will seat 2,000 audience members and have a 60×24-foot stage proscenium and a fly loft.

| Aug 11, 2010

People+Firms

| Aug 11, 2010

Citizenship building in Texas targets LEED Silver

The Department of Homeland Security's new U.S. Citizenship and Immigration Services facility in Irving, Texas, was designed by 4240 Architecture and developed by JDL Castle Corporation. The focal point of the two-story, 56,000-sf building is the double-height, glass-walled Ceremony Room where new citizens take the oath.

| Aug 11, 2010

Carpenters' union helping build its own headquarters

The New England Regional Council of Carpenters headquarters in Dorchester, Mass., is taking shape within a 1940s industrial building. The Building Team of ADD Inc., RDK Engineers, Suffolk Construction, and the carpenters' Joint Apprenticeship Training Committee, is giving the old facility a modern makeover by converting the existing two-story structure into a three-story, 75,000-sf, LEED-certif...

| Aug 11, 2010

Utah research facility reflects Native American architecture

A $130 million research facility is being built at University of Utah's Salt Lake City campus. The James L. Sorenson Molecular Biotechnology Building—a USTAR Innovation Center—is being designed by the Atlanta office of Lord Aeck & Sargent, in association with Salt-Lake City-based Architectural Nexus.

| Aug 11, 2010

San Bernardino health center doubles in size

Temecula, Calif.-based EDGE was awarded the contract for California State University San Bernardino's health center renovation and expansion. The two-phase, $4 million project was designed by RSK Associates, San Francisco, and includes an 11,000-sf, tilt-up concrete expansion—which doubles the size of the facility—and site and infrastructure work.

| Aug 11, 2010

Goettsch Partners wins design competition for Soochow Securities HQ in China

Chicago-based Goettsch Partners has been selected to design the Soochow Securities Headquarters, the new office and stock exchange building for Soochow Securities Co. Ltd. The 21-story, 441,300-sf project includes 344,400 sf of office space, an 86,100-sf stock exchange, classrooms, and underground parking.

| Aug 11, 2010

New hospital expands Idaho healthcare options

Ascension Group Architects, Arlington, Texas, is designing a $150 million replacement hospital for Portneuf Medical Center in Pocatello, Idaho. An existing facility will be renovated as part of the project. The new six-story, 320-000-sf complex will house 187 beds, along with an intensive care unit, a cardiovascular care unit, pediatrics, psychiatry, surgical suites, rehabilitation clinic, and ...

boombox1 - default
boombox2 -
native1 -

More In Category

Mass Timber

Mass timber a big part of Western Washington University’s net-zero ambitions

Western Washington University, in Bellingham, Wash., 90 miles from Seattle, is in the process of expanding its ABET-accredited programs for electrical engineering, computer engineering and science, and energy science. As part of that process, the university is building Kaiser Borsari Hall, the 54,000-sf new home for those academic disciplines that will include teaching labs, research labs, classrooms, collaborative spaces, and administrative offices.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021