flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

COVID-19: Construction completed on first phase of Chicago's McCormick Place into Alternate Care Facility

Coronavirus

COVID-19: Construction completed on first phase of Chicago's McCormick Place into Alternate Care Facility

Phase 1 construction on the first 500 beds was completed on Friday, April 3; 2,500 beds to follow.


By Walsh Construction | April 4, 2020
The first 500 patient rooms at McCormick Place Convention Center.

The first 500 patient rooms at McCormick Place Convention Center. The 10X10-foot "rooms" have a cot, folding chair, lamp, and blanket, and a bowl containing a toothbrush, surgical masks, and earplugs.

    

Walsh Construction, one of the largest contractors in the city of Chicago and in the United States, is leading the temporary conversion of a portion of the McCormick Place Convention Center into an Alternate Care Facility (ACF) for novel coronavirus patients.

Construction on the first 500 beds was completed on April 3. According to a report in the Chicago Tribune, 500 more beds (with 14 nursing stations) should be online this week and another 1,250 by April 20, with another 750 to follow. The facility will have the capacity to treat up to 3,000 low- to moderate-acuity patients across three of the convention center’s halls, where patients will be separated by level of care required.

In addition to patient rooms, the first phase has also seen installation of spaces for laundry machines, pharmacy services, medical supplies, housekeeping, and medical gas canister storage, according to the Chicago Tribune.

 

Walsh Construction at McCormick Place ACF conversionA Walsh Construction staff member views the first phase of the conversion of portion of the McCormick Place Convention Center into an alternate care facility for coronavirus patients. Photo: Press Pool

 

ARMY CORPS OF ENGINEERS, MPEA OVERSEEING CONVERSION OF THE CONVENTION FACILITY

The Metropolitan Pier and Exposition Authority (MPEA) in association with the United States Army Corps of Engineers is directing the conversion of McCormick Place into a facility focused on patient care, infection control, fire protection and life safety. The ACF is designed to relieve pressure on the hospital system by freeing up beds for more patients with severe COVID-19 cases in anticipation of the surge in positive COVID-19 diagnoses to come.

The temporary field hospital is expected to be complete by April 24, according to Walsh Construction. “We mobilized and began work immediately,” said Thomas Caplis, Vice President of Healthcare at Walsh Construction. “Walsh Construction is proud to support these extraordinary efforts of MPEA and Army Corps of Engineers that will offer essential care to our Chicago neighbors and much needed assistance to our vital healthcare system.”

Chicago-based Walsh Construction has a successful history of working directly with USACE and the Federal Emergency Management Agency to renovate and construct facilities and infrastructure on a fast-track basis. Throughout the COVID-19 pandemic, Walsh has assisted healthcare institutions with trailers, tents, cargo boxes, negative pressure rooms, and establishing other temporary measures on an as-needed basis.

 

WALSH122 YEARS IN OPERATION

Walsh Construction is the fifth largest healthcare contractor in the United States, providing construction services and delivering healing environments across North America. The Acute Care Facility at McCormick Place adds to its list of patient-first projects that include new hospitals, emergency departments, critical care units, and outpatient services.

Walsh Construction is part of The Walsh Group, a 122-year-old company providing design, build, finance and activation services across the building, transportation and water markets. The Walsh Group operates as Walsh Construction, Archer Western and Walsh Canada throughout 20 regional offices.

Related Stories

Coronavirus | Apr 2, 2020

COVID-19: CannonDesign initiates industry coalition to make masks for healthcare providers

Coalition formed to make DIY face masks for healthcare workers in COVID-19 settings.

Coronavirus | Apr 2, 2020

As virus spreads across North America, software providers step up with cost-free offerings

The goal is to keep construction projects moving forward at a time when jobs are being postponed or canceled.

Coronavirus | Apr 2, 2020

SBA and Treasury begin effort to distribute $349 billion in emergency small business capital

The new loan program will help small businesses with their payroll and other business operating expenses.

Coronavirus | Apr 2, 2020

Informed by its latest Crane Index, Rider Levett Bucknall anticipates the effect of coronavirus on the construction industry

While total crane count holds steady, turbulent economic conditions indicate a recession-based drop in construction costs.

Coronavirus | Apr 1, 2020

How is the coronavirus outbreak impacting your firm's projects?

Please take BD+C's three-minute poll on the AEC business impacts from the coronavirus outbreak.

Coronavirus | Apr 1, 2020

Opinion: What can we learn from the coronavirus pandemic?

The coronavirus pandemic will soon end, soon be in the rear-view mirror, but we can still take lessons learned as directions for going forward.

Coronavirus | Apr 1, 2020

Three reasons you should keep sewing face masks (as long as you follow simple best practices)

Here are three reasons to encourage sewists coast to coast to keep their foot on the pedal.

Coronavirus | Apr 1, 2020

TLC’s Michael Sheerin offers guidance on ventilation in COVID-19 healthcare settings

Ventilation engineering guidance for COVID-19 patient rooms

Coronavirus | Apr 1, 2020

February rise in construction outlays contrasts with pandemic-driven collapse in March as owners, government orders shut down projects

Survey finds contractors face shortages of materials and workers, delivery delays and cancellations.

boombox1 - default
boombox2 -
native1 -

More In Category

MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021