flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

The College of the Holy Cross completes a $110 million performing arts center

The College of the Holy Cross completes a $110 million performing arts center

Near Boston, the 84,000-square-foot facility includes a 400-seat concert hall and proscenium theater and a 200-seat flexible space.


By Novid Parsi, Contributing Editor | October 3, 2022
Prior Performing Arts Center ext
Courtesy DILLER SCOFIDIO + RENFRO.

In Worcester, Mass., a one-hour drive from Boston, the College of the Holy Cross has completed its $110 million Prior Performing Arts Center. Designed by Diller Scofidio + Renfro (DS+R), the 84,000-square-foot facility serves as an incubator for multidisciplinary learning and creativity, with venues for both fine arts and performing arts. The PAC will support creative collaboration among faculty and students across all academic disciplines.

Among the PAC’s key features, the Beehive is a flexible space that includes a shared multimedia teaching area for electronic music and musical composition courses, sound recording, sound editing, and video and film editing. The Beehive also provides collaborative workspaces, multipurpose rehearsal spaces, a cafe, and gathering spaces with movable furniture.

The Luth Concert Hall, a 400-seat convertible concert hall and proscenium theater, serves as the College’s principal venue for symphonic music, chamber music, jazz, gamelan, and opera, as well as musical theater and dance. The Boroughs Theatre is a 200-seat, fully flexible experimental theater space. And the Cantor Art Gallery offers a variety of interdisciplinary exhibits and increased exhibition and storage space.

Support spaces include a scene shop, costume design studio, recording studio, lighting and set design study, and multi-use spaces to encourage collaboration among the arts and between the arts and other disciplines. Outdoor amenities include a small amphitheater, an outdoor teaching area and workspace, a meditative garden, and a sculpture garden. 

Major inaugural performances at the PAC will take place in December, including the world premiere of a new violin concerto composed by a College of the Holy Cross professor.

On the Building Team:
Owner: College of the Holy Cross
Executive architect: Perry Dean Rogers
Landscape architect: OLIN
Civil engineer: Nitsch Engineering
MEP engineer: Altieri Sebor Wieber
Structural engineer: Robert Silman Associates

Prior PAC ext 2
Courtesy Iwan Baan.
Prior PAC int
Courtesy Iwan Baan.
Prior PAC theater
Courtesy Iwan Baan.
Prior PAC int 3
Courtesy Iwan Baan.
Prior PAC int 4
Courtesy Iwan Baan.
Prior PAC int 5
Courtesy Brett Beyer.
PAC Prior int 6
Courtesy Brett Beyer.
Prior PAC theater int 7
Courtesy Brett Beyer.

 

Related Stories

| Oct 5, 2012

2012 Reconstruction Award Bronze Winner: DPR Construction, Phoenix Regional Office, Phoenix, Ariz.

Working with A/E firm SmithGroupJJR, DPR converted a vacant 16,533-sf one-time “adult-themed boutique” in the city’s reemerging Discovery Triangle into a LEED-NC Platinum office, one that is on target to be the first net-zero commercial office building in Arizona.

| Oct 4, 2012

2012 Reconstruction Awards Silver Winner: Allen Theatre at PlayhouseSquare, Cleveland, Ohio

The $30 million project resulted in three new theatres in the existing 81,500-sf space and a 44,000-sf contiguous addition: the Allen Theatre, the Second Stage, and the Helen Rosenfeld Lewis Bialosky Lab Theatre.

| Jun 22, 2012

Revitalization Efforts Advance in Hackensack, N.J.

Work progresses on Cultural and Performing Arts Center and Atlantic Street Park

| Jun 8, 2012

Chestnut Hill College dedicates Jack and Rosemary Murphy Gulati complex

Casaccio Yu Architects designed the 11,300-sf fitness and social complex.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 14, 2012

Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons

Supertall two-tower complex located in Seoul’s Yongsan International Business District.

| Apr 30, 2012

KBE Building completes renovation at the ConnCAT

The $1.2 million project consisted of a 16,000-sf interior renovation.

| Apr 19, 2012

KTGY Group’s Arista Uptown Apartments in Broomfield, Colo. completed

First of eight buildings highlights unique amenities.

boombox1 - default
boombox2 -
native1 -

More In Category



Performing Arts Centers

Frank Gehry-designed expansion of the Colburn School performing arts center set to break ground

In April, the Colburn School, an institute for music and dance education and performance, will break ground on a 100,000-sf expansion designed by architect Frank Gehry. Located in downtown Los Angeles, the performing arts center will join the neighboring Walt Disney Concert Hall and The Grand by Gehry, forming the largest concentration of Gehry-designed buildings in the world.


Giants 400

Top 35 Performing Arts Center and Concert Venue Construction Firms for 2023

The Whiting-Turner Contracting Company, Holder Construction, McCarthy Holdings, Clark Group, and Gilbane Building Company top BD+C's ranking of the nation's largest performing arts center and concert venue general contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021