Hospital construction costs for 2024
Data from Gordian breaks down the average cost per square foot for a three-story hospital across 10 U.S. cities.
HORIZONTV FEATURING BD+C: WATCH EPISODES ON DEMAND AT HORIZONTV
Data from Gordian breaks down the average cost per square foot for a three-story hospital across 10 U.S. cities.
Biophilic design in the built environment supports the health and wellbeing of individuals, as they spend most of their time indoors.
Design elements that consider a diverse population of users make lives better. When it comes to wayfinding, some factors will remain consistent—including accessibility and legibility.
A redesign of the Mayo Clinic’s downtown campus in Rochester, Minn., centers around two new clinical high-rise buildings. The two nine-story structures will reach a height of 221 feet, with the potential to expand to 420 feet.
42nd annual awards from the Los Angeles Business Council honor design excellence.
The 332,000–sf design draws on the predominantly red brick character of The Christ Hospital’s existing buildings, interpreting it in a fresh and contemporary manner that fits well within the historic Mt. Auburn neighborhood while reflecting the institution’s dedication to experience, efficiency, flexibility, innovation and brand.
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
Children’s Hospital Colorado expects to host nearly 80,000 patient visits at the South Campus during its first year.
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
Download a PDF of the Entry Information at the bottom of this page.
Download a PDF of the Entry Form at the bottom of this page.
The Los Angeles Convention Center footage depicts the new convention center hall spaces, including a new lobby above Pico Boulevard, pre-function space, and what will be the largest multi-purpose ballroom in Los Angeles.
Kiger will manage current relationships and pursue other strategic clients, including select healthcare clients and strategic project pursuits in the Central Tennessee region.
This fully integrated Building Team opted for a multi-prime contracting strategy to keep construction going on Chicago’s Rush University Medical Center, despite the economic meltdown.