flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

BIG and HOK’s winning design for Zurich airport’s new terminal

Airports

BIG and HOK’s winning design for Zurich airport’s new terminal

The mass timber design pays homage to Switzerland’s iconic mountains and pitched roofs.


By Novid Parsi, Contributing Editor | June 29, 2022
Zurich Airport Dock A ext 1
Selected from 10 global competition entries, the winning proposal for the largest dock of the internationally acclaimed Zurich airport is comprised predominantly of solid regional wood. Courtesy BIG.

Two years ago, Zurich Airport, which opened in the 1950s, launched an international design competition to replace the aging Dock A—the airport’s largest dock. The winning design is led by BIG, with HOK as the aviation architect. The new Dock A—including gates, retail, lounges, offices, a new air traffic control tower, and an extension of the immigration hall—is slated to open by 2032.

The seven-floor Dock A will have two main areas: a central hub with shopping, airport services for arriving and departing passengers, and vertical circulation; and a pier with the gates, waiting areas, and fixed links connecting to the planes. The control tower will be placed in the building’s center.

Dock A’s structure, floors, and ceilings will be made primarily with mass timber. A renewable local resource, this material will allow for prefabrication during the construction process—while also nodding to the Swiss tradition of wood construction. The building’s V-shaped timber columns not only provide structural support but also reference Switzerland’s iconic mountains and pitched roofs.

“As airports grow and evolve and as international guidelines and safety requirements change, airports tend to become more and more complex: Frankensteins of interconnected elements, patches and extensions,” Bjarke Ingels, founder and creative director, BIG, said in a statement. “For the new main terminal of Zurich Airport, we have attempted to answer this complex challenge with the simplest possible response: a mass timber space frame that is structural design, spatial experience, architectural finish, and organizational principle in one.”

The long, sculptural roof will be covered with PV panels. Integrated shading will reduce solar heat gain and maintenance requirements. And the building will use a combination of water and air-based cooling and heating systems.

The “simple yet expressive design,” Ingels added, embodies “the cultural and natural elements of Swiss architecture.”

On the building team:
Owner: Zurich Airport
Design lead: BIG
Aviation architect: HOK
Local architect: 10:8
Structural engineer: Buro Happold
Structural engineer timber/building physics: Pirmin Jung Schweiz AG
Mechanical engineer: Haerter & Partner AG
Electrical engineer: TLP
Construction management: Baurealisation

Zurich Airport daylighting system
To enhance the passenger experience, the spaces within the new terminal use daylight as a natural wayfinding system. Courtesy BIG.
Zurich AIrport Dock A int
A contemporary, pared-back material palette, the structure, floors, and ceilings of Dock A are envisioned with timber as the main material. Courtesy BIG.
Dock A roof PV Panels
Dock A’s roof will be covered with PV panels while integrated shading will reduce solar heat gain and maintenance requirements, and a combination of water and air-based cooling and heating systems will improve the building’s energy demand. Courtesy BIG.

 

Related Stories

| Oct 16, 2014

Perkins+Will white paper examines alternatives to flame retardant building materials

The white paper includes a list of 193 flame retardants, including 29 discovered in building and household products, 50 found in the indoor environment, and 33 in human blood, milk, and tissues.

| Oct 12, 2014

AIA 2030 commitment: Five years on, are we any closer to net-zero?

This year marks the fifth anniversary of the American Institute of Architects’ effort to have architecture firms voluntarily pledge net-zero energy design for all their buildings by 2030. 

| Sep 24, 2014

Architecture billings see continued strength, led by institutional sector

On the heels of recording its strongest pace of growth since 2007, there continues to be an increasing level of demand for design services signaled in the latest Architecture Billings Index.

| Sep 22, 2014

4 keys to effective post-occupancy evaluations

Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.

| Sep 22, 2014

Sound selections: 12 great choices for ceilings and acoustical walls

From metal mesh panels to concealed-suspension ceilings, here's our roundup of the latest acoustical ceiling and wall products. 

| Sep 15, 2014

Ranked: Top international AEC firms [2014 Giants 300 Report]

Parsons Brinckerhoff, Gensler, and Jacobs top BD+C's rankings of U.S.-based design and construction firms with the most revenue from international projects, as reported in the 2014 Giants 300 Report.

| Sep 9, 2014

Using Facebook to transform workplace design

As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.

| Sep 8, 2014

First Look: Foster + Partners, Fernando Romero win competition for Mexico City's newest international airport

Designed to be the world’s most sustainable airport, the plan uses a single, compact terminal scheme in lieu of a cluster of buildings, offering shorter walking distances and fewer level changes, and eliminating the need for trains and tunnels. 

| Sep 3, 2014

New designation launched to streamline LEED review process

The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.

| Sep 2, 2014

Ranked: Top green building sector AEC firms [2014 Giants 300 Report]

AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms. 

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021