Two years ago, Zurich Airport, which opened in the 1950s, launched an international design competition to replace the aging Dock A—the airport’s largest dock. The winning design is led by BIG, with HOK as the aviation architect. The new Dock A—including gates, retail, lounges, offices, a new air traffic control tower, and an extension of the immigration hall—is slated to open by 2032.
The seven-floor Dock A will have two main areas: a central hub with shopping, airport services for arriving and departing passengers, and vertical circulation; and a pier with the gates, waiting areas, and fixed links connecting to the planes. The control tower will be placed in the building’s center.
Dock A’s structure, floors, and ceilings will be made primarily with mass timber. A renewable local resource, this material will allow for prefabrication during the construction process—while also nodding to the Swiss tradition of wood construction. The building’s V-shaped timber columns not only provide structural support but also reference Switzerland’s iconic mountains and pitched roofs.
“As airports grow and evolve and as international guidelines and safety requirements change, airports tend to become more and more complex: Frankensteins of interconnected elements, patches and extensions,” Bjarke Ingels, founder and creative director, BIG, said in a statement. “For the new main terminal of Zurich Airport, we have attempted to answer this complex challenge with the simplest possible response: a mass timber space frame that is structural design, spatial experience, architectural finish, and organizational principle in one.”
The long, sculptural roof will be covered with PV panels. Integrated shading will reduce solar heat gain and maintenance requirements. And the building will use a combination of water and air-based cooling and heating systems.
The “simple yet expressive design,” Ingels added, embodies “the cultural and natural elements of Swiss architecture.”
On the building team:
Owner: Zurich Airport
Design lead: BIG
Aviation architect: HOK
Local architect: 10:8
Structural engineer: Buro Happold
Structural engineer timber/building physics: Pirmin Jung Schweiz AG
Mechanical engineer: Haerter & Partner AG
Electrical engineer: TLP
Construction management: Baurealisation
Related Stories
| Oct 16, 2014
Perkins+Will white paper examines alternatives to flame retardant building materials
The white paper includes a list of 193 flame retardants, including 29 discovered in building and household products, 50 found in the indoor environment, and 33 in human blood, milk, and tissues.
| Oct 12, 2014
AIA 2030 commitment: Five years on, are we any closer to net-zero?
This year marks the fifth anniversary of the American Institute of Architects’ effort to have architecture firms voluntarily pledge net-zero energy design for all their buildings by 2030.
| Sep 24, 2014
Architecture billings see continued strength, led by institutional sector
On the heels of recording its strongest pace of growth since 2007, there continues to be an increasing level of demand for design services signaled in the latest Architecture Billings Index.
| Sep 22, 2014
4 keys to effective post-occupancy evaluations
Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.
| Sep 22, 2014
Sound selections: 12 great choices for ceilings and acoustical walls
From metal mesh panels to concealed-suspension ceilings, here's our roundup of the latest acoustical ceiling and wall products.
| Sep 15, 2014
Ranked: Top international AEC firms [2014 Giants 300 Report]
Parsons Brinckerhoff, Gensler, and Jacobs top BD+C's rankings of U.S.-based design and construction firms with the most revenue from international projects, as reported in the 2014 Giants 300 Report.
| Sep 9, 2014
Using Facebook to transform workplace design
As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.
| Sep 8, 2014
First Look: Foster + Partners, Fernando Romero win competition for Mexico City's newest international airport
Designed to be the world’s most sustainable airport, the plan uses a single, compact terminal scheme in lieu of a cluster of buildings, offering shorter walking distances and fewer level changes, and eliminating the need for trains and tunnels.
| Sep 3, 2014
New designation launched to streamline LEED review process
The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.
| Sep 2, 2014
Ranked: Top green building sector AEC firms [2014 Giants 300 Report]
AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms.