flexiblefullpage -
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

MINIMIZING RISK AND OPTIMIZING CONSTRUCTION MANAGEMENT WITH RAINSCREEN SPECIFICATION

MINIMIZING RISK AND OPTIMIZING CONSTRUCTION MANAGEMENT WITH RAINSCREEN SPECIFICATION


Provided By: MINIMIZING RISK AND OPTIMIZING CONSTRUCTION MANAGEMENT WITH RAINSCREEN SPECIFICATION
By Tamlyn May 24, 2017

Between the mid-1980s and early 2000s, close to 160,000 multi-family, wood-frame housing units were built in British Columbia, Canada. A confluence of factors resulted in 45% of those housing units experiencing issues with water infiltration and led to the issue being dubbed the “Leaky Condo Crisis.” Lengthy litigation processes and billions of dollars later, the crisis is still not fully resolved.

Failure to mitigate moisture can lead to a host of problems for homeowners, architects, and builders. By understanding the benefits of rainscreens, including new rainscreen technologies like a 3-in-1 water resistive barrier system, as well as best installation practices, specifiers can decrease project time and avoid unnecessary litigation.

LEARNING OBJECTIVES:

  • Identify the challenges facing the built environment due to ineffective rainscreen specification.
  • Examine the benefits specific to new rainscreen technologies, such as a 3-in-1 water resistive barrier system.
  • Analyze best practices for specifying a rainscreen system that enhances the building envelope through drainage, drying, and construction efficiency.
  • Explore opportunities where a 3-in-1 water resistive barrier system enables the construction project to decrease the overall project timeline, as well as labor and material costs.

Ready to put your knowledge to the test?

Don’t have an account? Click here to register for a free account now!   Forgot Password?

Learning Objectives

After reading this article, you should be able to:

Don’t have an account? Click here to register for a free account now!   Forgot Password?