flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

6 ways smart AEC firms are using computational design methods

BIM and Information Technology

6 ways smart AEC firms are using computational design methods

Rapid prototyping, custom plug-ins, and data dashboards are among the common applications for computational design.


By David Barista, Editorial Director | June 7, 2016

A project team at HDR collaborates on design solutions for a sports facility project with the help of data-driven design tools. The firm has been using CM tools for several years. Photo courtesy HDR

A growing number of firms, including HDR, NBBJ, and Thornton Tomasetti, are investing in talent and training to advance their computational design capabilities. Here’s a roundup of the clever applications for CD:

1. Rapid prototyping. Why design a few prototypes when you can create thousands to find the ideal solution? Algorithm-based design processes allow teams to develop and explore dozens, even hundreds, of prototypes in a matter of hours—something that would be impossible using traditional methods.

2. Rapid iteration. Similarly, computational design is being used to more efficiently test and refine particular design schemes through rapid iteration—design, test, refine, repeat, in quick succession.

3. Data dashboards. Data can be an incredibly helpful resource for Building Teams, especially if it’s readily accessible and real time. Progressive firms are using CD methods to extract vital data from, for example, BIM models to feed custom Excel dashboards. Other firms are investing in more scalable platforms, such as Web-based data visualization, to gain insight into their data. 

4. Automating repetitive duties. From mundane tasks like renaming files to complex projects like calculating the walking steps in a hospital floor plan, computational design tools can be used to automate the grunt work in the design process. 

 

Using computational design tools, a team at HDR created an iterative process for building on-the-fly parametric models directly from sketches.

 

5. Creating custom plug-ins for existing software platforms. Need a tool that doesn’t exist on the market? No problem. Just code a solution. An extreme example is Thornton Tomasetti’s TTX database, which provides real-time read, write, and sync capabilities across six software tools: ETABS, Grasshopper, RAM Structural System, Revit, SAP 2000, and Tekla.

6. Evaluating the performance of early design concepts. Energy analysis, daylight modeling, even cost and schedule impacts—CD tools allow teams to make informed decisions much earlier in the design process.

For more on computational design, see BD+C's feature story, “Conquer computational design: 5 tips for starting your journey.”

Related Stories

BIM and Information Technology | Jan 27, 2016

Seeing double: Dassault Systèmes creating Virtual Singapore that mirrors the real world

The virtual city will be used to help predict the outcomes of and possible issues with various scenarios.

BIM and Information Technology | Jan 26, 2016

How the Fourth Industrial Revolution will alter the globe’s workforce

The next great technological metamorphosis will be unlike anything humankind has experienced before, due to the sheer size, speed, and scope of disruption.

Great Solutions | Jan 20, 2016

Skanska’s new app helps construction teams monitor and meet environmental quality standards while renovating hospitals

App allows users to track noise, differential pressure levels, vibration, and dust

Augmented Reality | Jan 19, 2016

Will Generation Virtuals' office be a pair of glasses?

A waning need for office buildings may be on the horizon, thanks to the possibility of working remotely via new technologies like Google Cardboard, writes HDR's Rachel Park.

BIM and Information Technology | Dec 21, 2015

Laser scanning and in-shop prefabrication a boon for the WellStar Paulding Hospital

Contractor Brasfield & Gorrie’s use of BIM and prefabrication on the Hiram, Ga., hospital shows how digital tools can lead to savings, safety, and better construction.  

Sponsored | BIM and Information Technology | Dec 17, 2015

How is the Value of VDC for Design Management Translating Outside the US?

Sascha Vesterlund, a VDC Specialist, Design Processer with MT Højgaard, and Nathan Wood, Innovation at DPR Construction, shared their perspectives on VDC

BIM and Information Technology | Dec 3, 2015

New app visualizes cellular and Wi-Fi signals in an area

Using data collected from millions of cell towers and Wi-Fi routers, the app makes the invisible visible.

BIM and Information Technology | Nov 30, 2015

Light-based wireless technology is 100 times faster than Wi-Fi

Li-Fi, which reaches speeds of 224 gigabits per second, is being tested in Estonia.

Sponsored | BIM and Information Technology | Nov 25, 2015

Contractor leverages dynamic site logistic plan as BIM deliverable

I recently sat down with two Architects-Turned-VDC-Process-Managers to discuss the ways in which they are leveraging technology to bring the value of BIM downstream

BIM and Information Technology | Nov 24, 2015

Solving the data conundrum with better tools to capture, share, and analyze information

At a recent Thornton Tomasetti symposium, experts showed how designs and projects can be improved by granular information that’s accessible to more users. 

boombox1 - default
boombox2 -
native1 -

More In Category

AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021