flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

The writing on the wall: Maker spaces encourage students to take an active role

Great Solutions

The writing on the wall: Maker spaces encourage students to take an active role

Maker spaces, dry-erase walls, and flexible furniture highlight Kinkaid’s new Learning Center.


By David Malone, Associate Editor | July 12, 2017

Courtesy Kirksey

Can you read the writing on the wall? At the new Kinkaid Learning Center, in Houston, that question can be taken figuratively and literally.

Thanks to dry-erase walls that line the learning center’s maker spaces, reading the writing on the wall becomes just another step in the creation process.

Designed by Kirksey Architecture’s PK-12 Education Team, the learning center’s maker spaces are meant to create a flexible learning environment that veers somewhat from traditional teaching methods.

Included in the new 26,000-sf building are crafting spaces, sewing spaces, a custom laser printer, a 3D printing space, and transportable “pop-up” maker spaces that can easily be moved from one classroom to another.

Dry-erase walls located between two classrooms have the ability to slide apart to create one large classroom for co-teaching. A literature teacher teaching Kurt Vonnegut’s Cat’s Cradle could combine with a history teacher teaching about the nuclear arms race.

 

Courtesy Kirksey.

 

These maker spaces are meant to fight back against the “sage on the stage” concept of teaching. Kinkaid students can take an active, hands-on approach to their education.

This hands-on approach was integrated into the design process of the learning center, as well. Students and teachers took part in a visionary workshop, where they were asked to create an ideal environment for the new center and classrooms. Kirksey then integrated these suggestions into the final design.

The Nest is a workshop maker space equipped with the tools and materials necessary for building. New middle school classrooms use bright colors and floor-to-ceiling windows to allow for abundant natural light.

 

Courtesy Kirksey.

 

The furniture in these classrooms is easily movable to encourage student interaction. The idea of flexible, movable furniture was carried throughout the entire learning center to allow students to study and collaborate as effectively as possible.

The Kinkaid Learning Center just completed its first academic year after opening in time for the 2016 school year.

Related Stories

| Aug 11, 2010

New school designs don't go by the book

America needs more schools. Forty-five percent of the nation's elementary, middle, and high schools were built between 1950 and 1969, according market research firm ZweigWhite, Natick, Mass. Yet even as the stock of K-12 schools ages and declines, school enrollments continue to climb. The National Center for Education Statistics predicts that enrollment in public K-12 schools will keep rising...

| Aug 11, 2010

Bronze Award: Lincoln High School Tacoma, Wash.

Lincoln High School in Tacoma, Wash., was built in 1913 and spent nearly a century morphing into a patchwork of outdated and confusing additions. A few years ago, the Tacoma School District picked Lincoln High School, dubbed “Old Main,” to be the first high school in the district to be part of its newly launched Small Learning Communities program.

| Aug 11, 2010

Bronze Award: Hawthorne Elementary School, Elmhurst, Ill.

At 121 years, Hawthorne School is the oldest elementary school building in the Elmhurst, Ill., school district and a source of pride for the community. Unfortunately, decades of modifications and short-sighted planning had rendered it dysfunctional in terms of modern educational delivery. At the same time, increasing enrollment was leading to overcrowding, with the result that the library, for ...

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021