flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

A Wisconsin contractor takes a personal approach to getting employees to achieve their full potential

Contractors

A Wisconsin contractor takes a personal approach to getting employees to achieve their full potential

Miron Construction’s “Dream Project” helps remove obstacles to self actualization.


By John Caulfield, Senior Editor | August 7, 2017

Miron Construction's “dream coach,” Eric Marcoe, tries to present a “mirror” to employees so they can see themselves clearer to achieve their ambitions. Image: Miron Construction

Eric Marcoe is 42 years, married, two young kids, likes to canoe and hike.

Nothing out of the ordinary until you hear that for the past two years Marcoe has been Miron Construction’s “dream coach,” a position the Wisconsin-based contractor initiated in 2013 to help its employees achieve personal goals that sometimes—but not necessarily—coincide with the company’s work goals for them.

The genesis of Miron Construction’s Dream Project was in the form of a gift: Tonya Dittman, Miron’s pre-construction specialist, gave a copy of The Dream Manager by Matthew Kelly to the company’s CEO and co-owner David Voss.

From that exchange emerged a program, which Miron Construction manages through its human resources department, that is unique because “it’s 100% personal,” says Marcoe.

His background included stints as a corporate trainer and coach. Prior to becoming Miron’s dream coach, he was doing organizational development for a healthcare company that involved leadership training and coaching. He has received International Coach Federation certification through the Institute for Professional Excellence in Coaching.

But Marcoe doesn’t provide answers or advice to Miron’s employees. Instead, he creates space for the individual “to think, feel, and see [him- or herself] closely in the mirror” that Marcoe sees himself as representing.

Indeed, some employees come to Marcoe not knowing what they want to do. His role is to “pick up on” themes in order to help them identify goals and the obstacles that prevent their achievement.

The company has posted several videos on YouTube of employees who have gone through the Dream Project’s self-actualization process successfully.

Mary Cummings, a project accountant, came to Marcoe with the goal of becoming a published writer. This ambition didn’t come from out of the blue, Marcoe tells BD+C, as Cummings’s her mother and sister had been published, and Cummings (who has a degree in economics) has had a long-time interest in journalism, communications, and blogging.

As Marcoe spent more time with her, Cummings “grew into an awareness of herself,” and within two months (May 2016) she had placed an article with her favorite online magazine. This process, says Marcoe, also allowed Cummings “to see her potential in other areas,” and to see her larger goal as writing the chapters of her life. Cummings says the Dream Project helped her “learn a set of skills to allow you to accomplish whatever goals you have in the future.

Marcoe’s greatest success to date, in his estimation, has been Jason Fuhrman, Miron’s director of hard-bid estimation, primarily because Furhman was a skeptic. “He didn’t believe in the Project, and two months in, I was asking myself ‘what have I gotten myself into,’ ” recalls an amused Marcoe.

Fuhrman was unconvinced that he could have a dream “with all the stuff that’s going on with my life.”

In their early sessions, Marcoe and Fuhrman focused on how Furhman could delegate more tasks to others in his department in order to free up time at work and at home to do things he enjoys, like downhill skiing with his seven-year-old daughter. 

“It’s really changed my life and has given me a more positive outlook,” says Fuhrman. He sees the whole point of the Dream Project “to give people at Miron a better life and home, and a better life in general.”

And Marcoe says that Fuhrman’s “conversion” to the process was a key to convincing more of Miron’s employees to participate. “Many employees now looking to meet with me have been encouraged by a coworker who has experienced coaching and has been inspired by the who they have become.”

Miron employs 1,200 people, and during his tenure as dream coach Marcoe has “encountered” more than 125 associates, and currently works actively with 50.

Marcoe says that he’d like to incorporate group coaching into the Dream Project. And longer term, he’s like to teach coaching courses, so that Miron’s culture “gets to the point where my role would be eliminated.”

Related Stories

| Feb 11, 2011

Four Products That Stand Up to Hurricanes

What do a panelized wall system, a newly developed roof hatch, spray polyurethane foam, and a custom-made curtain wall have in common? They’ve been extensively researched and tested for their ability to take abuse from the likes of Hurricane Katrina.

| Feb 11, 2011

RS Means Cost Comparison Chart: Office Buildings

This month's RS Means Cost Comparison Chart focuses on office building construction.

| Feb 11, 2011

Sustainable features on the bill for dual-building performing arts center at Soka University of America

The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.

| Feb 11, 2011

BIM-enabled Texas church complex can broadcast services in high-def

After two years of design and construction, members of the Gateway Church in Southland, Texas, were able to attend services in their new 4,000-seat facility in late 2010. Located on a 180-acre site, the 205,000-sf complex has six auditoriums, including a massive 200,000-sf Worship Center, complete with catwalks, top-end audio and video system, and high-definition broadcast capabilities. BIM played a significant role in the building’s design and construction. Balfour Beatty Construction and Beck Architecture formed the nucleus of the Building Team.

| Feb 11, 2011

Kentucky’s first green adaptive reuse project earns Platinum

(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.

| Feb 11, 2011

Former Richardson Romanesque hotel now houses books, not beds

The Piqua (Ohio) Public Library was once a late 19th-century hotel that sat vacant and deteriorating for years before a $12.3 million adaptive reuse project revitalized the 1891 building. The design team of PSA-Dewberry, MKC Associates, and historic preservation specialist Jeff Wray Associates collaborated on the restoration of the 80,000-sf Richardson Romanesque building, once known as the Fort Piqua Hotel. The team restored a mezzanine above the lobby and repaired historic windows, skylight, massive fireplace, and other historic details. The basement, with its low ceiling and stacked stone walls, was turned into a castle-like children’s center. The Piqua Historical Museum is also located within the building.

| Feb 11, 2011

Justice center on Fall River harbor serves up daylight, sustainable elements, including eucalyptus millwork

Located on historic South Main Street in Fall River, Mass., the Fall River Justice Center opened last fall to serve as the city’s Superior and District Courts building. The $85 million facility was designed by Boston-based Finegold Alexander + Associates Inc., with Dimeo Construction as CM and Arup as MEP. The 154,000-sf courthouse contains nine courtrooms, a law library, and a detention area. Most of the floors have the same ceiling height, which will makes them easier to reconfigure in the future as space needs change. Designed to achieve LEED Silver, the facility’s elliptical design offers abundant natural daylight and views of the harbor. Renewable eucalyptus millwork is one of the sustainable features.

| Feb 11, 2011

Research facility separates but also connects lab spaces

California State University, Northridge, consolidated its graduate and undergraduate biology and mathematics programs into one 90,000-sf research facility. Architect of record Cannon Design worked on the new Chaparral Hall, creating a four-story facility with two distinct spaces that separate research and teaching areas; these are linked by faculty offices to create collaborative spaces. The building houses wet research, teaching, and computational research labs, a 5,000-sf vivarium, classrooms, and administrative offices. A four-story outdoor lobby and plaza and an outdoor staircase provide orientation. A covered walkway links the new facility with the existing science complex. Saiful/Bouquet served as structural engineer, Bard, Rao + Athanas Consulting Engineers served as MEP, and Research Facilities Design was laboratory consultant.

| Feb 11, 2011

A feast of dining options at University of Colorado community center, but hold the buffalo stew

The University of Colorado, Boulder, cooked up something different with its new $84.4 million Center for Community building, whose 900-seat foodservice area consists of 12 micro-restaurants, each with its own food options and décor. Centerbrook Architects of Connecticut collaborated with Denver’s Davis Partnership Architects and foodservice designer Baker Group of Grand Rapids, Mich., on the 323,000-sf facility, which also includes space for a career center, international education, and counseling and psychological services. Exterior walls of rough-hewn, variegated sandstone and a terra cotta roof help the new facility blend with existing campus buildings. Target: LEED Gold.

boombox1 - default
boombox2 -
native1 -

More In Category




MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021