flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Where Construction Meets Religion

Sponsored Content Religious Facilities

Where Construction Meets Religion

An Ohio builder was presented with religious requirement challenges while building a temple. But with flexible scheduling and strong communication, he ensured the appropriate blessings and rituals were performed during all stages of construction and that all of the temple’s unique design requirements were met. The outcome: divine success.


By Star Building Systems | September 25, 2015
Builder balances construction and religious schedule in temple completion

The 16,000-sf temple, in the wooded suburbs north of Columbus, OH, utilized a Star Building System. Although it does not look it, it is a single-slope roof structure. 

Maverick Builders, of Grove City, Ohio, has built numerous churches over the years, some of them metal building systems. In recent times, their business has expanded to include houses of worship for a variety of religions. In 2012, they completed their first temple of Sri Saibaba, a sect related to the Hindu religion, with its origins in 19th century India. There are active devotees in many countries, including the US. In 2000, the Sri Saibaba Temple Society of Central Ohio was founded with its primary goal being the construction of a temple in Lewis Center, OH. It took a decade, but they achieved that goal. Design began in 2010, construction began in 2011, and the temple was completed by April 2012. The temple now regularly welcomes 400 worshippers.

Despite Maverick’s extensive experience in the religious sector, this project posed a few unfamiliar challenges. Some of the challenges related to specific religious requirements of the building, which impacted both design and construction. There were also structural aspects that were uncommon for metal building systems that had to be solved.

The 16,000-sf temple, in the wooded suburbs north of Columbus, OH, utilized a Star Building System. Although it does not look it, it is a single-slope roof structure. Parapet wall extensions of various heights create interest and depth to the exterior elevations. The walls are metal wall panels covered with a multi-colored EIFS finish with special accent features. The overall effect is more like a traditional stone-column structure with brightly colored plaster infill walls. A membrane rubber roof was installed over structural metal decking, supported by the Star structure.

The temple is a two-story building, with a basement level that rises 4 feet above grade. The second level is on a suspended precast concrete floor. This is an atypical condition, as many metal building systems are built as slab-on-grade. Engineering to properly transfer the roof and wall loads to the foundation is a little trickier than normal, and was made more complicated by significant point loads of large ornamental structures at several locations on the roof.

There were a number of unusual design features. Maverick Builders’ owner, Paul McKnight, recalls that some of the interior spaces weren’t located where they would be if designed from a purely architectural standpoint. The beliefs of the congregation required specific compass-orientations for certain rooms. The temple sanctuary had to be oriented correctly, as did the direction of staircase travel, and even the bathroom layout. Both interior and exterior designs feature walkways that circle the building and main prayer hall, which are used as part of the religious ceremonies.

The roof bears several heavy ornamental elements, each of which requires a roof curb and appropriate engineering for the increased load. The clear span pre-engineered rafters were designed to support seven point loads. The largest of these is the 2-ton shikhara, the pyramid-like structure that is the most prominent exterior feature of a Hindu temple. It is located directly over the focal point of the sanctuary.

In addition, the construction schedule needed to be coordinated with the owners so that appropriate blessings and religious rituals could be performed at certain stages of construction, such as when sacred objects were being installed. This sometimes involved dozens of people occupying the site while it was still under construction, a challenging and risky situation that contractors usually like to avoid. McKnight, however, recognized the importance of making these ceremonies possible, “to make sure that everything is blessed properly. It will bring good luck on everyone involved,” he says. “In today’s times, you need all the good luck you can get, so we happily cooperated with all of those requirements.”

There was one crucial phase of construction that could not be performed until the entire building was otherwise complete. The 4000 lb., Italian marble statue of Saibaba, the focal point of the sanctuary, was the last thing to be placed in the building. In order to accomplish this, Maverick had to build a framed opening into the roof directly over the intended location of the statue. It was temporarily sealed for weather tightness during construction. When everything else was complete, the roof was opened, and the statue was lowered in by crane. A domed ceiling was placed over the statue, the roof was permanently sealed, and the large shikhara was installed on the roof.

Maverick Builders was awarded a Master Builder Award for “Best Specialty Building,” presented at Star’s annual national sales meeting.

On the website of the Saibaba Temple Society of Central Ohio, there is a page devoted to construction updates, where it says, “It is often told that being able to participate and contribute in a noble activity like building a temple that will serve several thousand people year after year is a once in a lifetime opportunity.” It appears this may not be true for Maverick Builders, however.  Word of the great success of this project has apparently gotten around to other congregations, and there may be more temples and more such opportunities in Maverick’s future.  

Project: Sri Saibaba Temple, Lewis Center, Ohio

Design/Builder – Maverick Builders, Inc., Grove City Ohio
Architect – CDI, Design, LLC, (Maverick’s in-house designer)
Building manufacturer – Star Building Systems
Steel erection – Maverick Builders
HVAC – Command Heating
Plumbing – Command Plumbing
Electric – Westlake Electric
Concrete – Eagle Concrete
Framing & drywall – Fry Drywall
Painting – Listing Painting
EIFS – Damron Finish Systems
Roofing – Harmac Roofing

Related Stories

| Jan 19, 2015

Gaudi’s first work outside Spain will be a chapel in Chile

Nearly 100 years after Antoni Gaudí’s death, Chile will begin constructing a chapel using his designs.

| Jan 9, 2015

Santiago Calatrava talks with BBC about St. Nicholas Church on Ground Zero

Calatrava reveals that he wanted to retain the “tiny home” feel of the original church building that was destroyed with the twin towers on 9/11.

| Jan 2, 2015

Construction put in place enjoyed healthy gains in 2014

Construction consultant FMI foresees—with some caveats—continuing growth in the office, lodging, and manufacturing sectors. But funding uncertainties raise red flags in education and healthcare.

| Dec 28, 2014

AIA course: Enhancing interior comfort while improving overall building efficacy

Providing more comfortable conditions to building occupants has become a top priority in today’s interior designs. This course is worth 1.0 AIA LU/HSW.

| Dec 2, 2014

Nonresidential construction spending rebounds in October

This month's increase in nonresidential construction spending is far more consistent with the anecdotal information floating around the industry, says ABC's Chief Economist Anirban Basu.

| Oct 23, 2014

Santiago Calatrava-designed church breaks ground in Lower Manhattan

Saturday marked the public "ground blessing" ceremony for the Saint Nicholas National Shrine, the Greek Orthodox Church destroyed on 9/11 by the collapse of the World Trade Center towers. 

| Oct 16, 2014

Perkins+Will white paper examines alternatives to flame retardant building materials

The white paper includes a list of 193 flame retardants, including 29 discovered in building and household products, 50 found in the indoor environment, and 33 in human blood, milk, and tissues.

| Oct 15, 2014

Harvard launches ‘design-centric’ center for green buildings and cities

The impetus behind Harvard's Center for Green Buildings and Cities is what the design school’s dean, Mohsen Mostafavi, describes as a “rapidly urbanizing global economy,” in which cities are building new structures “on a massive scale.” 

| Oct 14, 2014

Proven 6-step approach to treating historic windows

This course provides step-by-step prescriptive advice to architects, engineers, and contractors on when it makes sense to repair or rehabilitate existing windows, and when they should advise their building owner clients to consider replacement. 

| Oct 12, 2014

AIA 2030 commitment: Five years on, are we any closer to net-zero?

This year marks the fifth anniversary of the American Institute of Architects’ effort to have architecture firms voluntarily pledge net-zero energy design for all their buildings by 2030. 

boombox1 - default
boombox2 -
native1 -

More In Category

Giants 400

Top 40 Religious Facility Construction Firms for 2023

Crossland Construction, Haskell, Big-D Construction, Whiting-Turner, and JE Dunn Construction top BD+C's ranking of the nation's largest religious facility general contractors and construction management (CM) firms for 2023, as reported in the 2023 Giants 400 Report.




Giants 400

Top 115 Architecture Engineering Firms for 2023

Stantec, HDR, Page, HOK, and Arcadis North America top the rankings of the nation's largest architecture engineering (AE) firms for nonresidential building and multifamily housing work, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021