flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Viega ProPress shines in SolarCity construction

Sponsored Content HVAC

Viega ProPress shines in SolarCity construction

Buffalo will be the first city to produce the first-ever true solar roof – a roofing product with solar panels built in.


By Viega | April 6, 2017

SolarCity manufacturing plant at RiverBend in South Buffalo

SolarCity’s 1.2 million-square-foot manufacturing facility is the crown jewel of the $750 million, 96-acre RiverBend project. Buffalo was the first American city to have widespread electric lighting by harnessing power from Niagara Falls. Today, it will be the first city to produce the first-ever true solar roof – a roofing product with solar panels built in.

General contractor LPCiminelli selected Quackenbush to install piping to all the HVAC wet systems, including condenser water, chilled water, tertiary chilled water, heating water and heat recovery water. But the size of the building on the SolarCity project meant it would be a substantial undertaking for the contractor.

“Given the speed and scope of the project,” said Scott Maze, Senior Project Manager for Quackenbush, “we realized about a month-and-a-half into it that we would have difficulty sourcing enough qualified welders to complete our scope of work in a timely manner.”

That’s when the project’s engineering firm provided them with an alternative.

“Viega ProPress for 304 Stainless,” Maze said, “used as another installation means for the tertiary chilled water.”

Quackenbush had used Viega ProPress and Viega MegaPress® systems in the past, so its workers were familiar with the benefits press technology could provide.

 

Viega ProPress® Stainless fittings.

 

Quackenbush had up to six people pre-fabricating the tertiary water lines, and, in the field, two teams of eight. It only took three months to complete the ProPress piping installation throughout five mezzanines where the air handling units are located.

“The quality and consistency of Viega’s products provided us the ability to pre-fabricate part of the subassemblies at our facility,” Maze said. “We turned construction into production by assembling them in advance instead of individually constructing them in the field.”

For Quackenbush, this made a difference in completing the job on time. When the Viega option became available, Paul Lepine, Estimating Manager for Quackenbush, approached his local Viega sales representative to find a distributorship that could handle the volume and the timeline of the SolarCity project.

Quackenbush needed to install 10,500 Viega ProPress Stainless fittings in various sizes and configurations. With so many fittings needed for the SolarCity project, the Viega rep had to chase specific fittings across the world in order to fill the order quantities Quackenbush needed. And that’s exactly what he did.

“He was instrumental in making this job happen from a delivery standpoint. We just placed an order for sixty 4" elbows two days ago, and he is collecting them now,” Lepine said. “Viega should be very happy with him. I don’t think he ever let us down on a request.”

When Quackenbush increased the pace on the project, their Viega rep brought out a few RIDGID® press tools for them to borrow.

“With the training Viega provided, the folks were able to pick up the installation fairly quickly,” Maze said. “The tools are user-friendly. Once you develop the system, you tend to pick up production and can step up your pace. We were pleased with the quality of the product.”

Read more about this project here.

Tags

Related Stories

M/E/P Systems | Jan 27, 2022

Top 5 building HVAC system problems and how to fix them

When your HVAC system was new, it was designed to keep the indoor environment comfortable, functional, and safe. Over time, that system can drift out of alignment, leading to wasted resources, excessive energy consumption, and reduced occupant comfort.

Resiliency | Jul 15, 2021

A new report urges federal investment in healthier buildings

The National Institute of Building Sciences also calls for code changes and greater cooperation between building owners and the AEC community.

Coronavirus | Apr 1, 2020

TLC’s Michael Sheerin offers guidance on ventilation in COVID-19 healthcare settings

Ventilation engineering guidance for COVID-19 patient rooms

Sponsored | HVAC | Feb 3, 2020

Reliable Building Systems Increase Net Operating Income by Retaining Tenants

Tenants increasingly expect a well-crafted property that feels unique, authentic, and comfortable—with technologically advanced systems and spaces that optimize performance and encourage collaboration and engagement. The following guidance will help owners and property managers keep tenants happy.

Sponsored | HVAC | Jan 6, 2020

Four Ways Building Systems Create Long-term Profitability

When accounting for the total cost of ownership and the potential return on investment, owners and developers should consider total energy usage, the lifespan of building systems equipment, the recruitment and retention of occupants, and lease rates.

Sponsored | HVAC | Jan 6, 2020

Maximize Energy Efficiency in Class A Office Buildings With Modern Building Systems

Energy-efficient building design starts with the building envelope, but the building systems have a tremendous impact on energy use as well.

75 Top Building Products | Dec 16, 2019

101 Top Products for 2019

Building Design+Construction readers and editors select their top building products for the past 12 months in the fourth-annual 101 Top Products report.

75 Top Building Products | Dec 16, 2019

Top Building Systems Products for 2019

FabricAir’s ceiling-hung fabric duct and Ellumi Lighting’s bacteria-killing lights are among the 13 new building systems products to make Building Design+Construction's 2019 101 Top Products report.

Sponsored | HVAC | May 4, 2018

How the Bank of San Antonio achieved comfort and efficiency in their new office building

Since project completion, the VRF system has provided precise comfort control for the building’s occupants. 

Sponsored | Plumbing | Nov 10, 2017

Big ideas in a small space

Tiny house with Viega products finished second in a tiny house competition in California.

boombox1 - default
boombox2 -
native1 -

More In Category




MFPRO+ News

Nine states pledge to transition to heat pumps for residential HVAC and water heating

Nine states have signed a joint agreement to accelerate the transition to residential building electrification by significantly expanding heat pump sales to meet heating, cooling, and water heating demand. The Memorandum of Understanding was signed by directors of environmental agencies from California, Colorado, Maine, Maryland, Massachusetts, New Jersey, New York, Oregon, and Rhode Island. 

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021