flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

An urban wind and solar energy system that may actually work

Energy Efficiency

An urban wind and solar energy system that may actually work

The system was designed to take advantage of a building's air flow and generate energy even if its in the middle of a city.


By BD+C Staff | January 28, 2015
An urban wind and solar energy system that may actually work
An urban wind and solar energy system that may actually work

Building-integrated wind turbine technology has been receiving a lot of heat for not being able to deliver what it promises in terms of energy production. 

Fast Co. Exist profiles a system that places the turbines where they can actually turn. The WindRail was designed in Zurich, Switzerland, where there isn’t enough space for a wind or solar park. Sitting between a building’s façade and the roof edge, the system combines wind and solar energy harvesting, taking advantage of the building’s air flows, even if it's in the middle of a city.

The system was developed by the Anerdgy. “When wind flows around the building, it creates a pressure difference between the façade and the rooftop. The façade has a higher wind pressure,” CEO of Anerdgy Sven Koehler told Fast Co. Exist. “Because we are channeling the wind and making a connection between the high and low pressure areas, the speeds are faster and we have more energy.”

Koehler, an engineer and economist, came up with the idea with the help of his parents. After years of research, he came up with the WindRail System and started the company in 2012.

According to the company, pressure effect accounts for 50% of the power the WindRail generates. The device comes in two meter modules and can generate 1,500 to 2,000 kWh a year. For comparison, the average U.S. home uses 10,837 kWh a year, Fast Co. Exist reports.

Read more at Fast Co. Exist.

 

Related Stories

Sponsored | Metals | Jul 20, 2015

Life cycle assessment, and why you should care

LCA is a way of quantifying the environmental impact generated by the manufacture and delivery of a product.

Sponsored | Energy Efficiency | Jun 30, 2015

Which Is More Efficient: Wood Walls or Steel and Masonry With Continuous Insulation?

By nature, wood has nearly four times the thermal resistance of steel or masonry

Sponsored | Transit Facilities | Jun 15, 2015

Success through teamwork for landmark California project

The Anaheim Regional Transportation Intermodal Center (ARTIC) is the Grand Central Station of the future

Green | Jun 9, 2015

Fuel cell technology makes its way into energy generation

Demand for fuel cells, while modest, is growing, and cost savings are getting noticed.

Cultural Facilities | Apr 16, 2015

Milwaukee’s Lakeshore State Park visitor center will be ‘off the grid’

The plans also include a built-in wastewater treatment system and rainwater collection.

Green | Apr 7, 2015

USGBC survey shows Fortune 200 companies prioritize green building

The world’s top-performing companies are prioritizing sustainability as part of their corporate social responsibility efforts, and a majority of them are using LEED to achieve their goals, according to the new survey.

Codes and Standards | Apr 6, 2015

DOE releases Better Buildings Workforce Guidelines

The guidelines are aimed at strengthening and streamlining commercial building workforce training and certification programs for workers in energy auditing, building commissioning, building operations, and energy management.

Energy Efficiency | Apr 2, 2015

C40 cities across the globe are making sustainability a policy

The U.S. Green Building Council and C40 Cities Climate Leadership Group with the World Green Building Council released landmark green building city market briefs highlighting sustainable building policies in 66 cities around the world.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021