flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Updated standard for liquid applied flashing for exterior wall openings released

Codes and Standards

Updated standard for liquid applied flashing for exterior wall openings released

AAMA document establishes minimum performance requirements.


By Peter Fabris, Contributing Editor | June 27, 2019

Courtesy Pixabay

The American Architectural Manufacturers Association (AAMA) has released an updated specification establishing minimum performance requirements for liquid-applied flashing used to provide water-resistive seals around exterior wall openings in buildings.

The standard applies to fenestration products, such as windows and doors, as well as other through-wall penetrations. AAMA 714-19, “Voluntary Specification for Liquid Applied Flashing Used to Create a Water-Resistive Seal around Exterior Wall Openings in Buildings,” was last updated in 2015.

“Liquid-applied flashing products are seeing increasing application for sealing building interfaces, including flashing around windows and doors,” said Jim Katsaros (DuPont Building Performance Solutions), chair of the AAMA Flashing Committee, in an AAMA news release. “These products offer many performance advantages, including outstanding adhesion to a wide variety of substrates, ultimate conformability for complex geometries and, in many cases, vapor permeable water-resistant seals.”

The AAMA 714 document also sets minimum durability requirements for these materials. Both the International Residential Code and the International Building Code reference AAMA 714.

Related Stories

| Oct 13, 2011

New Law: California Building Standards Commission Must Include Green Expert

A new California law, AB 930, requires that one member of the California Building Standards Commission be “experienced and knowledgeable in sustainable building, design, construction, and operation.”

| Oct 13, 2011

AGC Urges Repeal of 3% Withholding On Government Contracts

The U.S. House of Representatives is planning a vote in October on a bill to repeal the 3% withholding requirement on all federal and state contracts for goods and services.

| Oct 13, 2011

House Bill Would Block New OSHA Regulations

Proposed riders in a U.S. House of Representatives spending bill would block the Occupational Safety and Health Administration (OSHA) from issuing controversial workplace safety and health regulations.

| Oct 11, 2011

AIA introduces five new documents for use on sustainable projects

These new documents will be available in the first quarter of 2012 as part of the new AIA Contract Documents service and AIA Documents on Demand.

| Oct 7, 2011

GREENBUILD 2011: UL Environment releases industry-wide sustainability requirements for doors

  ASSA ABLOY Trio-E door is the first to be certified to these sustainability requirements.

| Oct 6, 2011

Taking tenant behavior into account on building energy codes

Over the past few years, Seattle, San Francisco, Austin, and Washington, D.C., have passed laws requiring property owners to measure and disclose their energy use, which would help place a market value on a building’s efficiency and provide a benchmark for improvements.

| Oct 6, 2011

Constructed properly, green roofs hold up well in a hurricane

The heavy rains and high winds of Hurricane Irene didn’t cause any problems for a Con Edison green roof in New York City. The roof contains sedum, a plant that adapts well to drought and handles periods of heavy rain well.

| Oct 6, 2011

RoofPoint: A new green standard for roofs

Structured much like other rating systems, RoofPoint, establishes green standards specifically for roofs.

| Oct 6, 2011

Roofers critical of new OSHA harness rules

Roofers say a new OSHA rule requiring all residential roofers to wear a safety harness makes workers less safe, and is causing lost business for those who comply with the rule.

| Oct 6, 2011

Florida county proposes saving on construction costs by trumping city regulations

This summer, Pinellas County, FL wanted to save money on an $81 million public safety complex in Largo by using the county’s own building regulations and permit fees, not the city’s more expensive fees.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021