flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Toronto’s newest hospital employs 10 robots for moving food, supplies, and equipment

Great Solutions

Toronto’s newest hospital employs 10 robots for moving food, supplies, and equipment

The 1.8 million-sf Humber River Hospital is loaded with high-tech gadgets. Its coolest innovation is the use of automated guided vehicles.


By David Barista, Editorial Director | January 4, 2016
Toronto’s newest hospital employs 10 robots for moving food, supplies, and equipment

Photo courtesy Humber River Hospital

Forget autonomous cars. How about self-guided robots in hospitals? It’s reality, at least for one healthcare institution: Humber River Hospital in northwest Toronto.

The new 1.8 million-sf hospital, which opened in October 2015, is loaded with high-tech gadgets—smart bed technology, robotics for surgical procedures, automated laboratory processing, bedside computer screens—to enhance patient care delivery and improve efficiency, accuracy, reliability, and safety.

Its coolest innovation is the use of automated guided vehicles (AGV) to distribute a host of items throughout the 13-story facility, including medical equipment, linens, and food. The hospital’s 10 AGVs move at the speed of an average person walking, and are programmed to call elevators, open doors, pick up loaded carts, and determine the best timing of each delivery based on their location, the priority level of the call, and the time of day. The robots use 238 custom-built carts to carry food and supplies throughout the hospital.

What happens when patients or staff members come into contact with an AGV? Just like in the movies, they are programmed to assimilate. The vehicles stop for people crossing in front of them. If a path is blocked, they will politely ask people to move (yes, they can speak) or send an alert to logistics to have someone clear the path. Digital signage notifies staff when an AGV is approaching in an adjacent hallway.

On the Building Team: Plenary Health and HCP Social Infrastructure (developers), HDR (architect, healthcare consultant), Johnson Controls (facilities management), and PCL (GC).

Related Stories

| Aug 11, 2010

3 Hospitals, 3 Building Teams, 1 Mission: Optimum Sustainability

It's big news in any city when a new billion-dollar hospital is announced. Imagine what it must be like to have not one, not two, but three such blockbusters in the works, each of them tracking LEED-NC Gold certification from the U.S. Green Building Council. That's the case in San Francisco, where three new billion-dollar-plus healthcare facilities are in various stages of design and constructi...

| Aug 11, 2010

Holyoke Health Center

The team behind the new Holyoke (Mass.) Health Center was aiming for more than the renovation of a single building—they were hoping to revive an entire community. Holyoke's central business district was built in the 19th century as part of a planned industrial town, but over the years it had fallen into disrepair.

| Aug 11, 2010

Right-Sizing Healthcare

Over the past 30 years or so, the healthcare industry has quietly super-sized its healthcare facilities. Since 1980, ORs have bulked up in size by 53%, acute-care patient rooms by 77%. The slow creep went unlabeled until recently, when consultant H. Scot Latimer applied the super-sizing moniker to hospitals, inpatient rooms, operating rooms, and other treatment and administrative spaces.

| Aug 11, 2010

Great Solutions: Healthcare

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021