flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

These three hoteliers make up two-thirds of all new hotel development in the U.S.

Hotel Facilities

These three hoteliers make up two-thirds of all new hotel development in the U.S.

With a combined 3,523 projects and 400,490 rooms in the pipeline, Marriott, Hilton, and InterContinental dominate the U.S. hotel construction sector.


By Lodging Econometrics | October 31, 2022
These three hoteliers make up two-thirds of all new hotel development in the U.S.

Photo: Jonathan Kemper via Unsplash

According to the quarterly United States Construction Pipeline Trend Report from Lodging Econometrics (LE), the franchise companies with the largest construction pipelines at the end of Q3 2022 are led by Marriott International with 1,385 projects/168,725 rooms. Following Marriott is Hilton Worldwide with 1,351 projects/152,383 rooms, and InterContinental Hotels Group (IHG) with 787 projects/79,382 rooms.

Combined, these three companies account for 66% of the projects and 64% of the rooms in the total pipeline. Each company has seen growth year-over-year.

These three franchise companies also have the most projects and rooms in each stage of the construction pipeline. Marriott leads with the greatest number of projects in the under construction stage with 259 projects/35,946 rooms, then Hilton with 248 projects/31,698 rooms, and IHG with 135 projects/15,688 rooms currently under construction.

At the close of the third quarter, Marriott also leads with the most projects scheduled to start construction in the next 12 months with 739 projects/87,626 rooms, followed by IHG with 484 projects/46,957 rooms, and Hilton with 333 projects/38,043 rooms.

Hilton set record high project and rooms counts in the early planning stage at the Q3 close, totaling 770 projects/82,642 rooms. Marriott currently has 387 projects/45,153 rooms in early planning and IHG closed the quarter with 168 projects/16,737 rooms in the early planning stage.

Hotel construction by brand 

The brands of each of these companies with the largest number of projects in the pipeline at Q3 are Hilton’s Home2 Suites with 494 projects/50,809 rooms; IHG’s Holiday Inn Express with 297 projects/28,323; and Marriott’s TownePlace Suites with 291 projects/27,329 rooms. Other prominent brands in the pipeline for these franchise companies are the Hampton by Hilton brands with 281 projects/28,543 rooms; Marriott’s Fairfield Inn with 238 projects/21,988 rooms; and IHG’s Avid Hotel brand with 135 projects/11,445 rooms.

Through the end of the third quarter, Marriott opened 102 new hotels/12,908 rooms. Hilton opened 90 new hotels/10,834 rooms, and IHG opened 40 projects/4,120 rooms.


ALSO SEE: Top 115 Hotel Sector Architecture and AE Firms for 2022


 

LE analysts forecast Marriott will open the most new hotels in 2023 with 168 hotels/20,952 rooms. Next is Hilton with 136 new hotels/17,049 rooms, followed by IHG with 89 new hotels/9,588 rooms. In 2024, LE forecasts that Marriott will open 192 new hotels/22,815 rooms. Hilton is expected to open 154 new hotels/16,967 rooms and IHG is expected to open 142 new hotels/14,596 rooms.

Related Stories

| Aug 11, 2010

Construction employment declined in 333 of 352 metro areas in June

Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America.  The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.

| Aug 11, 2010

VA San Diego Healthcare System Building 1 Seismic Correction
San Diego, Calif.

Three decades after its original construction in the early 1970s, the Veterans Affairs San Diego Healthcare System Building 1 fell far short of current seismic codes. This not only put the building and its occupants—patients, doctors, nurses, visitors, and administrative staff—at risk in the event of a major earthquake, it violated a California state mandate requiring all hospitals to either retrofit or rebuild.

| Aug 11, 2010

Casino Queen breaks ground on $2.15 million entertainment venue

The Casino Queen in East St. Louis, Ill., is raising the stakes in its bid to capture a larger share of the local gaming market with the start of construction on a new $2.15 million sports bar and entertainment venue that will enhance the overall experience for guests.

| Aug 11, 2010

Outdated office tower becomes Nashville’s newest boutique hotel

A 1960s office tower in Nashville, Tenn., has been converted into a 248-room, four-star boutique hotel. Designed by Earl Swensson Associates, with PowerStrip Studio as interior designer, the newly converted Hutton Hotel features 54 suites, two penthouse apartments, 13,600 sf of meeting space, and seven “cardio” rooms.

| Aug 11, 2010

HDR, Perkins+Will top BD+C's ranking of the nation's 100 largest healthcare design firms

A ranking of the Top 100 Healthcare Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

10% of world's skyscraper construction on hold

Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021