flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Texas Rangers’ Globe Life Field progresses toward its 2020 completion date

Sports and Recreational Facilities

Texas Rangers’ Globe Life Field progresses toward its 2020 completion date

The stadium will be the cornerstone of the Texas Live! Development.


By David Malone, Associate Editor | April 4, 2019

All renderings courtesy HKS Architects

Globe Life Field, the Texas Rangers currently-under-construction ballpark, is progressing towards its March 2020 completion date. The ballpark is designed by HKS architects with VLK Architects acting as the associate architect. The stadium is the cornerstone of Texas Live!, a dining, entertainment, and luxury hospitality complex that has been under construction since 2016.

One of the biggest functional changes Globe Life Field will provide compared to the Rangers’ current home ballpark is the new retractable roof that will keep players out of the Texas heat. Another large change will be the synthetic playing surface from Shaw Sports Turf. The synthetic grass will provide similar aesthetics to natural grass and will be combined with natural clay basepaths.

 

Globe Life Stadium concourse

 

The $1.1 billion, 1.7 million-sf stadium will be built on a 13-acre site and have a capacity of 40,000. It will have five entry gates to ease crowd congestion upon entering and exiting the stadium. When complete, Globe Life Field will feature 725 concrete columns throughout and 780 piers drilled into the ground that make up the building foundation.

 

See Also: HKS unveils retractable-roof ballpark in Japan

 

A series of experiences for fans will include clubs, themed restaurants, retail, and a Hall of Fame exhibit. Globe Life Park will be the MLB’s first new ballpark since the Atlanta Braves Opened SunTrust Park in 2017. Manhattan Construction Company is the general contractor. Walter P Moore is the structural engineer.

 

Behind home plate at Globe Life Field

 

Outside of Globe Life Field

Related Stories

| Apr 10, 2014

Collegiate sports becoming greener: Survey

A survey conducted from May through June 2013 by the University of Arizona Office of Sustainability and published by the Natural Resources Defense Council (NRDC)* finds that more collegiate athletic teams are adopting green and sustainable practices in operation of their sports facilities.

| Apr 9, 2014

Colossal aquarium in China sets five Guinness World Records

With its seven salt and fresh water aquariums, totaling 12.87 million gallons, the Chimelong Ocean Kingdom theme park is considered the world’s largest aquarium.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

| Mar 25, 2014

Sydney breaks ground on its version of the High Line elevated park [slideshow]

The 500-meter-long park will feature bike paths, study pods, and outdoor workspaces.

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 13, 2014

Do you really 'always turn right'?

The first visitor center we designed was the Ernest F. Coe Visitor Center for the Everglades National Park in 1993. I remember it well for a variety of reasons, not the least of which was the ongoing dialogue we had with our retail consultant. He insisted that the gift shop be located on the right as one exited the visitor center because people “always turn right.” 

| Mar 12, 2014

14 new ideas for doors and door hardware

From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations. 

| Feb 26, 2014

Billie Jean King National Tennis Center serving up three-phase expansion

The project includes the construction of two new stadiums and a retractable roof over the existing Arthur Ashe Stadium. 

boombox1
boombox2
native1

More In Category



Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021