flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Mar 15, 2017

Energy Star program at risk

The standard-setting initiative for energy-efficient products may be a victim of Trump budget cuts.

Codes and Standards | Mar 13, 2017

U.S. House and Senate have voted to repeal Dept. of Labor’s 'blacklisting' rule

The rule mandates labor compliance review for federal construction contractors.

Codes and Standards | Mar 9, 2017

WiredScore forms Connectivity Advisory Committee

The committee's creation is an important step forward for the group that evaluates internet connectivity in buildings.

Codes and Standards | Mar 8, 2017

New guide examines multifamily high-performance ventilation

The focus is on cost and performance of various systems.

Codes and Standards | Mar 7, 2017

Canada’s national building codes will encompass effects of climate change

Forecasted data, not historical data, will be used as the basis for the codes.

Codes and Standards | Mar 6, 2017

ConsensusDocs updates standard short contract editions

The updates address industry changes impacting insurance, legal, technology, and terminology.

Codes and Standards | Mar 3, 2017

ASCE updates standard for structures using tensile membrane

The new sstandard combines guidelines for conventional tensile membrane structures with frame-covered membrane structures.

Codes and Standards | Mar 1, 2017

EPA's 2017 Construction General Permit now in effect

The regulation governs compliance with effluent limits.

Codes and Standards | Feb 28, 2017

Concern grows for high tide flood vulnerability in Mid-Atlantic states

Washington, D.C., and Annapolis, Md., could flood every three days by 2045.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021