flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Of Sky Garages and Dezervators: Porsche Design Tower sets a new standard of cool with the help of fire rated glass

Sponsored Content Fire-Rated Products

Of Sky Garages and Dezervators: Porsche Design Tower sets a new standard of cool with the help of fire rated glass

Glazing is predominantly used in several areas as a priority was placed on clear views and transparency in the building’s overall design.


By SaftiFirst | August 24, 2015
Of Sky Garages and Dezervators:  Porsche Design Tower sets a new standard of cool with the help of fire rated glass

To meet the code requirements of the elevator enclosure and ensure that the ocean views were available, SAFTI FIRST supplied SuperLite II-XL 120 with GPX Curtain Wall Framing for the 2-hour segmented wall starting from the lobby. Renderings courtesy of Metrostudio.com.  

Perhaps no other residential high-rise has created more buzz than the highly-anticipated Porsche Design Tower in Sunny Isles, Florida. A collaboration between Dezer Development and the Porsche Design Group, the 60-story, 132-residence luxury tower designed by Sieger Suarez Architects promises to deliver a new standard of cool.

Porsche Design Tower features a unique, first-of-its kind amenity that allows residents of this 60-story luxury residential project to park their cars in glass-walled sky garages adjacent to their units. The residents will ride their car into one of three Dezervators, a patented, fully-automated glass elevator designed by Gil Dezer and his team of engineers. They will remain in their car securely and enjoy oceanfront views as they ascend to their unit. At that point, their vehicle is shuttled to a glass enclosed carport adjacent to their residence.  This allows them to leisurely unload their groceries or shopping items. 

Glazing is predominantly used in several areas as a priority was placed on clear views and transparency in the building’s overall design – including applications where fire rating requirements are mandated in the building code.

In Section 713 of the IBC, shaft enclosures are required to have a minimum fire-resistance rating of not less than two hours when connecting four stories or more, which was the case for Porsche Design Tower. To meet code requirements and ensure that the ocean views were available, SAFTI FIRST supplied SuperLite II-XL 120 with GPX Curtain Wall Framing for the 2-hour segmented wall starting from the lobby.

In Section 406 of the IBC, a one hour separation is required between a parking garage and dwelling unit.  However, since the sky garages for each unit are connected to the 2-hour elevator shaft, the separation between the garage and the living space must follow the more stringent 2-hour fire resistive requirement. To meet code and enable residents to view their cars from their living room, SAFTI FIRST supplied SuperLite II-XL 120 in GPX Architectural Series Framing for all of the units. 


To meet code and enable residents to view their cars from their living room, SAFTI FIRST supplied SuperLite II-XL 120 in GPX Architectural Series Framing for all of the units. Renderings courtesy of Metrostudio.com.  

SuperLite II-XL 120 has the largest tested and listed clear view area for any 2-hour fire resistive glazing product in the industry with 4,876 sq. inches.  This was an important feature that allowed the architects to use more glass and less framing, especially with individual glass lites requiring clear views up to 4,674 sq. inches each.  The GPX Curtain Wall and Architectural Series framing systems were supplied with a PPG Kynar Steel City Silver finish to match the adjacent non-rated systems.  Durable and structurally sound, its sharp, clean edges and uniform sightlines enhanced the building’s sleek design.  The GPX Curtain Wall and Architectural Series framing systems can supplied either knocked-down, assembled or unitized depending on the project’s needs and job site conditions.

SAFTI FIRST’s sales, engineering and project management teams were in close contact with the architect, general contractor and glazier throughout the entire process to ensure everything was delivered on time and within budget.  SAFTI FIRST also sent a team from its manufacturing facility in Merced, CA to train and assist the glaziers in the field as they installed the fire rated glass and framing systems. 

 “When Porsche teamed up with a high-caliber developer like Dezer Development and an award-winning design firm like Sieger Suarez Architects, the creative process sizzled,” says Tim Nass, VP of National Sales at SAFTI FIRST.  “We were fortunate to be part of a world-class construction team that has erected this iconic, water front tower admired across South Florida.  Continental Glass Systems is an excellent, highly skilled partner and Coastal Construction Group ran an efficient site in very close quarters.  It was a pleasure to be a part of this project.”

Construction is in the final stages for the Porsche Design Tower, and it is scheduled to welcome residents in 2016.

Related Stories

| Jan 10, 2014

What the states should do to prevent more school shootings

To tell the truth, I didn’t want to write about the terrible events of December 14, 2012, when 20 children and six adults were gunned down at Sandy Hook Elementary School in Newtown, Conn. I figured other media would provide ample coverage, and anything we did would look cheap or inappropriate. But two things turned me around.

| Jan 10, 2014

Special Report: K-12 school security in the wake of Sandy Hook

BD+C's exclusive five-part report on K-12 school security offers proven design advice, technology recommendations, and thoughtful commentary on how Building Teams can help school districts prevent, or at least mitigate, a Sandy Hook on their turf.

| Jan 9, 2014

16 recommendations on security technology to take to your K-12 clients

From facial recognition cameras to IP-based door hardware, here are key technology-related considerations you should discuss with your school district clients.

| Dec 13, 2013

Safe and sound: 10 solutions for fire and life safety

From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies. 

| Dec 5, 2013

Exclusive BD+C survey shows reaction to Sandy Hook tragedy

More than 60% of AEC professionals surveyed by BD+C said their firms experienced heightened interest in security measures from school districts they worked with. 

| Nov 14, 2013

Tyco acquires Westfire Inc.

US Operations of Global Acquisition Strengthen Tyco SimplexGrinnell’s Special Hazards Fire Protection Capabilities for Mining, Telecommunications and Energy Markets

| Oct 27, 2013

SimplexGrinnell Awarded Contract by National Joint Powers Alliance for Streamlined Procurement of Fire and Life-Safety Solutions

Agreement Provides 50,000 Public Entities with Simplified Access to Comprehensive Suite of Products and Services

| Aug 23, 2013

The Exploratorium’s tall order

The newly-opened Exploratorium has brought energy and excitement to the city’s bustling waterfront.  EHDD transformed the historic Pier 15, built in 1915, to a 330,000 square foot indoor and outdoor campus, being touted as the largest net-zero building in the city and potentially the largest net-zero museum in the world.

| Aug 22, 2013

New CO-PLATE makes revenue generation through CO detector replacement easier

With the first round of system-connected carbon monoxide (CO) detectors reaching their end of life, there’s a big opportunity for dealers and installers to increase their revenue streams through CO detector replacements. System Sensor has launched a new CO-PLATE Carbon Monoxide Detector Plate to coincide with this opportunity. 

| Jul 12, 2013

Statue of Liberty Monument bolstered by Vetrotech Saint-Gobain’s fire-rated glass

The Statue of Liberty National Monument reopened to the public featuring two new fire stairwells and an elevator that will allow visitors with reduced mobility to look into the Statue’s interior structure. 

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021