State inspectors in Shenzhen, China, have found at least 15 local plants producing concrete with unprocessed sea sand. Thirty-one companies have been cited for violations, and eight were ordered to suspend business for a year. Construction on multiple projects in Guangdong Province—including the 660-m Ping'an Finance Center—has been halted during the inspection. (Only 80 meters of the Ping'an building has been erected so far; China Construction First Building Group Corp. Ltd. is the primary contractor.)
Unprocessed sea sand is illegal to use as an aggregate in concrete because its chlorine and salt content are corrosive to steel, causing buildings to degrade and potentially collapse within a few decades. River sand, the preferred material, costs twice as much and is in short supply.
The scandal is currently confined to Shenzhen but could spread to other cities given the obvious financial incentives for using sea sand. Inspectors also found that two large sand pits were using seawater instead of fresh water to rinse sand, also a problematic practice.
Industry experts express particular concern because China currently has nine of the putative 20 tallest buildings in the world currently under construction, as well as many other skyscrapers.
(http://www.scmp.com/news/china/article/1191896/shenzhen-construction-hold-after-alert-over-cheap-sand-concrete)
Related Stories
| Apr 12, 2012
Solar PV carport, electrical charging stations unveiled in California
Project contractor Oltman Construction noted that the carport provides shaded area for 940 car stalls and generates 2 MW DC of electric power.
| Apr 11, 2012
Shawmut appoints Tripp as business development director
Tripp joined Shawmut in 1998 and previously held the positions of assistant superintendent, superintendent, and national construction manager.
| Apr 11, 2012
Corgan & SOM awarded contract to design SSA National Support Center
The new SSA campus is expected to meet all Federal energy and water conservation goals while achieving LEED Gold Certification from the United States Green Building Council.
| Apr 11, 2012
C.W. Driver completes Rec Center on CSUN campus
The state-of-the-art fitness center supports university’s goal to encourage student recruitment and retention.
| Apr 10, 2012
JE Dunn completes two medical office buildings at St. Anthony’s Lakewood, Colo. campus
Designed by Davis Partnership Architects, P.C., Medical Plaza 1 and 2 are four-story structures totaling 96,804-sf and 101,581-sf respectively.
| Apr 10, 2012
THINK [about architecture] Scholarship enters 15th year
Students are invited to submit two-minute creative videos that illustrate how they interact with their school's design and what the space makes possible.
| Apr 10, 2012
Structured Development & Bucksbaum close on new retail site in Chicago
The site is the location of New City, a mixed-use development that will feature 370,000-sf of retail space and 280 residential rental units.
| Apr 10, 2012
Moriarty & Associates selected as GC for Miami’s BrickellHouse Condo
Construction of the 46-story development is schedule to get underway this summer and be completed in 2014.