flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Seaport World Trade Center will offer Bostonians 737,000 sf of waterfront mixed-use space

Mixed-Use

Seaport World Trade Center will offer Bostonians 737,000 sf of waterfront mixed-use space

Schmidt Hammer Lassen Architects is designing the project.


By David Malone, Associate Editor | February 18, 2019
Boston's Seaport WTC

All renderings courtesy Schmidt Hammer Lassen Architects

Built on the site of what was once the largest pier building in the world, Boston’s Seaport World Trade Center will be an expansive mixed-use development on Commonwealth Pier that will include office space, retail, dining, public amenities, and event space.

Commonwealth Pier currently houses corporate offices, shops, and restaurants. The revitalization will improve public access throughout the site, expand the retail offerings, and enhance site resiliency and sustainability.

 

See Also: Schmidt Hammer Lassen’s first U.S. project breaks ground in Detroit

 

The new office space will connect workers directly to over 160,000 sf of outdoor public space that includes courtyards, walkways, green rest spaces, and a grand plaza. A new 24,500-sf public waterfront plaza is envisioned as the pier’s central gathering point.

 

Seaport WTC

 

Harborwalk, a paved pedestrian path, will run along the perimeter of the entire project. The path will be lined with custom seating, planters, and lighting. The walkway will occasionally expand at niches cut into the building’s facades where public seating, sheltered areas, signage, and connectivity to retail and dining will be provided.

Many of the pier building’s historic components will be preserved, such as the stone arches and cornice of the Headhouse. Columns and column connections of the original building will also be left exposed.

The Seaport World Trade Center marks Schmidt Hammer Lassen’s second U.S. project and is slated to begin construction in early 2020. CBT Architects is the executive architect and Sasaki is the landscape architect.

Tags

Related Stories

Mixed-Use | Aug 4, 2020

San Jose’s new tallest building tops out

Steinberg Hart designed the project.

Mixed-Use | Jul 27, 2020

$92 million reconstruction of St. Petersburg Municipal Pier completes

Rogers Partners, ASD | SKY, and landscape architect Ken Smith Workshop designed the project.

Mixed-Use | Jul 22, 2020

Skanska selects Pickard Chilton to design innovative office tower in Bellevue, Wash.

The 800,000-gsf mixed-use project is located at 10660 NE 8th Street.

Mixed-Use | Jul 21, 2020

Phase one of The Orbit masterplan detailed for Innisfil, Ontario

Partisans is designing the project.

Mixed-Use | Jul 20, 2020

J. Small Investments, Lyda Hill Philanthropies have unveiled plans for a 23-acre mixed-use development in Dallas

The vacant campus was purchased from ExxonMobil Oil Corporation in 2015.

Mixed-Use | Jul 17, 2020

Ryan Companies breaks ground on 122-acre Highland Bridge redevelopment in St. Paul, Minn.

The community’s goal is to provide 100% renewable energy to its houses and businesses.

Mixed-Use | Jul 14, 2020

Apartments and condos occupy what was once a five-story car dealership

Wisznia | Architecture+Development designed, developed, and is managing the project.

Mixed-Use | Feb 21, 2020

SB Architects to design Fort Lauderdale’s FATVillage mixed-use destination

The project will build upon the existing FATVillage Arts District.

Mixed-Use | Feb 14, 2020

Kenya’s Pinnacle Tower will be the tallest tower in Africa

ArchGroup Consultants is designing the project.

boombox1
boombox2
native1

More In Category




MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021