flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

San Diego charter school finds home in existing public library building

K-12 Schools

San Diego charter school finds home in existing public library building

The school is located on the sixth and seventh floors of a downtown public library and embraces flexible school days, internship opportunities, and project-based learning.


By BD+C Staff | June 30, 2015
San Diego charter school finds home in existing public library building

Design highlights include a “living room” setting with flexible furniture. Photos courtesy LPA, Inc.

The LPA Inc.-designed e3 Civic High School in San Diego is the first facility of its kind in the nation. Located inside a public library, the school combines a sustainable and creative learning environment for charter school students.

The school is located on the sixth and seventh floors of the library and embraces flexible school days, internship opportunities, and project-based learning. 

Design highlights include a “living room” setting with flexible furniture; a central staircase that doubles as a social learning space; an interactive wall on which students can write and display projects; and a centrally-located gallery lined with whiteboard surfaces and specialty lighting where students can share their work. 

The Building Team also included: LSW Engineers (MEP) and Acentech (A/V and acoustical).

 

 

Here is the project description from LPA, Inc.:
The LEED Gold certified, e3 Civic High-which stands for "Engage, Educate and Empower," is creatively co-located inside a downtown San Diego public library in a unique collaborative setting. While library patrons don't have access to the school, they can catch a glimpse inside the project-based educational environment as they ride a glass elevator through the building's sixth and seventh floors.

The transparent design and unique location, which capitalizes on the library's existing infrastructure, was chosen to foster team-based, experiential-learning opportunities with the help of movable glass walls, modular furniture, a demonstration kitchen, break-out learning spaces and a plaza area for assemblies and dining.

LPA also engaged the community in the design process through workshops, charettes, image sharing and building tours to help promote the school's partnership with the city and library foundation in linking education into the urban culture.

 

Related Stories

| Aug 11, 2010

Jacobs, Hensel Phelps among the nation's 50 largest design-build contractors

A ranking of the Top 50 Design-Build Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Gilbane, Manhattan Construction top BD+C's ranking of the nation's 50 largest K-12 school contractors

A ranking of the Top 50 K-12 School Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report

A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

| Aug 11, 2010

Clark Group, Mortenson among nation's busiest state/local government contractors, according to BD+C's Giants 300 report

A ranking of the Top 40 State/Local Government Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit /giants

| Aug 11, 2010

Lincoln High School
Tacoma, Wash.

Lincoln High School in Tacoma, Wash., was built in 1913 and spent nearly a century morphing into a patchwork of outdated and confusing additions. A few years ago, the Tacoma School District picked Lincoln High School, dubbed “Old Main,” to be the first high school in the district to be part of its newly launched Small Learning Communities program.

| Aug 11, 2010

Call for entries: Building enclosure design awards

The Boston Society of Architects and the Boston chapter of the Building Enclosure Council (BEC-Boston) have announced a High Performance Building award that will assess building enclosure innovation through the demonstrated design, construction, and operation of the building enclosure.

| Aug 11, 2010

Portland Cement Association offers blast resistant design guide for reinforced concrete structures

Developed for designers and engineers, "Blast Resistant Design Guide for Reinforced Concrete Structures" provides a practical treatment of the design of cast-in-place reinforced concrete structures to resist the effects of blast loads.  It explains the principles of blast-resistant design, and how to determine the kind and degree of resistance a structure needs as well as how to specify the required materials and details.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021