flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Recycled recreation: Waste-to-energy plant combines with ski resort

Recycled recreation: Waste-to-energy plant combines with ski resort

Artificial snow will allow year-round use for this unique Danish landmark.


By BD+C Staff | March 5, 2013
A man-made mountain will conceal a waste-to-energy facility near Copenhagen.
A man-made mountain will conceal a waste-to-energy facility near Copenhagen.

 

A new project near Copenhagen pushes the boundaries of the term "mixed use," combining a waste-to-energy plant with a ski resort. The Amagerforbrænding Energy Plant, designed by Bjarke Ingels Group, will feature an incinerator wrapped in mesh, forming an artificial hill. BIG's theme of "hedonistic sustainability" suffuses this effort to turn an industrial facility into a tourist destination. The 95,000 sm facility will provide ample room for a ski slope featuring more than 1,500 m of runs, designed by German firms Topotek 1 and Man Made Land. Recycled synthetic granular material will be used instead of snow, facilitating year-round skiing. A smoke-ring generator will make use of water vapor emitted by the incinerator, creating an impressive display combined with lasers. Completion is projected for 2016.

(http://www.designbuild-network.com/projects/waste-to-energy/)

Related Stories

| Apr 30, 2012

KBE Building completes renovation at the ConnCAT

The $1.2 million project consisted of a 16,000-sf interior renovation.

| Apr 27, 2012

GreenExpo365.com to offer webinars on EPA’s WaterSense Program

Architects and builders interested in developing water-efficient buildings invited to attend free sessions featuring experts discussing water-efficient building practices.

| Apr 27, 2012

APA launches wood design web portal for building and design pros

Design professionals who are members of APA’s Professional Associates are automatically enrolled in the APA Designers Circle program.

| Apr 27, 2012

China Mobile selects Leo A Daly to design three buildings at its new HQ

LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.

| Apr 27, 2012

CSM Group names Comerford as senior project manager

Comerford’s responsibilities include directing and verifying contract compliance by the trade contractors to ensure the owner’s expectations are met in respect to a quality finished project.

| Apr 27, 2012

Hampton Bays Middle School winner of the first National Green Ribbon Schools Program

School was the first LEED-certified public school in the state of New York.

| Apr 26, 2012

USGBC announces inaugural Green Apple Day of Service

On Sept. 29, 2012, participants from all over the world will volunteer to make the schools and campuses in their communities healthier and more sustainable.

| Apr 26, 2012

Gensler's Leiserowitz: Employs holistic philosophy to foster clients' creativity, comfort

Leiserowitz became regional managing principal in Chicago for San Francisco-based architecture and design giant Gensler a little more than a year ago.

| Apr 26, 2012

Blackney Hayes Architects launches new engineering division

The new division, BHH Engineers, will be led by Mark Hershman, PE.

| Apr 26, 2012

Energy efficiency requirements heighten the importance of proper protection for roofing systems

Now more than ever, a well-insulated and well protected roof is critical in new or renovated commercial buildings.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021