flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Reconstruction of Hall of Fame football stadium in Ohio moving forward

Sports and Recreational Facilities

Reconstruction of Hall of Fame football stadium in Ohio moving forward

The $80 million sports facility is among the features planned for a 90-acre mixed-use village.


By John Caulfield, Senior Editor | August 29, 2016

A new 23,000-seat football stadium will be a centerpiece within a retail/sports/entertainment/lifestyle village associated with the Pro Football Hall of Fame in Canton, Ohio.  Image: HKS

The steel structure for a new 23,000-seat football stadium that will be part of the $500 million, 90-acre Hall of Fame Village in Canton, Ohio, should be visible to travelers on Interstate 77 by next Christmas.

The old stadium’s north and south stands have been demolished, and the press box—which was built in 2009—will meet the wrecking ball next week, to be replaced by a larger area for media.

The new facility, called Tom Benson Hall of Fame Stadium and formerly known as Fawcett Stadium, is on schedule to be completed in time for next year’s Pro Football Hall of Fame enshrinement festival, although some elements won’t be completed until 2018. The stadium’s cost alone is projected to exceed $80 million.

Tom Benson, who owns the New Orleans Saints pro football team, has donated $11 million to the Hall of Fame, nearly all of it earmarked for the stadium reconstruction. The state is kicking in $10 million, and the city of Canton $5 million for the new stadium. The Canton City Schools owns the stadium, but will only be on the hook for its maintenance.

HKS’s Sports and Entertainment Group is the stadium’s designer, working with clients Industrial Realty Group and the Pro Football Hall of Fame.

The 76-year-old Fawcett Stadium has been a high school field. Its ticket booths are among the artifacts being preserved for future display within the Village.

This fall, construction begins on the Hall of Fame Village that will involve between 400 and 500 workers.

There are eight components to Hall of Fame Village, according to its website:

•The Pro Football Hall of Fame Museum

•Tom Benson Hall of Fame Stadium/Sports & Entertainment Complex, which will include a first-of-its-kind permanent stage that will be embedded into the stadium’s seating bowl and located at midfield. The field is being lowered by 12 feet to accommodate a fan plaza that connects to the Hall of Fame museum.

•A four-star Hotel & Conference Center

•Legends Landing/Residential (an assisted living facility, some of which could be housing for retired pro football players)

•A state-of-the-art Youth Sports Complex, which is already underway

•Center for Excellence (Coaches University; Academy of Corporate Excellence; Officiating Clinics; Safety, Health & Performance Center)

•Main Street Hall of Fame (restaurants, retail)

•Hall of Fame/NFL Family Experience (high-tech virtual reality experiences and rides)

An economic feasibility study indicates that Hall of Fame Village will create more than 13,000 new jobs, and over a 25-year period will generate $15.3 billion in net new total economic output within Stark County, Ohio.

Related Stories

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

AEC Tech | Dec 17, 2020

The Weekly show: The future of eSports facilities, meet the National Institute for AI in Construction

The December 17 episode of BD+C's The Weekly is available for viewing on demand. 

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

Giants 400 | Dec 3, 2020

2020 Sports Facilities Sector Giants: Top architecture, engineering, and construction firms in the U.S. sports facilities sector

Kimley-Horn, Mortenson, and Populous top BD+C's rankings of the nation's largest sports facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

AEC Tech | Nov 12, 2020

The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

BD+C editors speak with experts from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot on the November 12 episode of "The Weekly." The episode is available for viewing on demand.

Building Team Awards | Nov 2, 2020

Fans come first at Allianz Field

The new home of the Minnesota United soccer club wins a Silver Award in BD+C’s 2020 Building Team Awards. 

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

Sports and Recreational Facilities | Jul 9, 2020

Florida Gators’ $65 million baseball field completes

Populous and Walker Architects designed the project.

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021