flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Phoenix Sky Harbor Airport’s new terminal prioritizes passenger experience and sustainability

Airports

Phoenix Sky Harbor Airport’s new terminal prioritizes passenger experience and sustainability

The $310 million addition includes eight new gates, and is set to open for passengers this summer.


By Malcolm Crumbley, Associate Editor | July 8, 2022
Phoenix Sky Harbor Terminal 4
Courtesy SmithGroup.

McCarthy Building Companies recently completed construction of the final concourse in Terminal 4 at Phoenix Sky Harbor International Airport. The new concourse, designed by SmithGroup in partnership with Corgan, is located at the southwest corner of the terminal adjacent to the low D concourse.

For this specific terminal at Phoenix Sky Harbor International Airport, this project was seen as a much needed investment for not only passengers, but the airport itself. Terminal 4 is the busiest at the airport and handles more than 80% of traffic annually. During peak periods, the terminal often reaches full capacity, and now the addition of eight new gates brings the Terminal 4’s gate total to 92.

Improving Airport Passenger Experience

The project team focused on implementing features to improve passenger experience while they wait for their flight. The gates provide a number of customer amenities, from charging stations at every seat to technologies designed to improve accessibility and comfort.

Other passenger experience features include:

  • 25,000 sf of shell spaces for retail
  • Food and beverage concessions
  • A 24,000-sf transfer bridge
  • Terminal processor improvements
  • Expansion of an existing security checkpoint
  • Additional ticket counters
  • New baggage handling systems


Going Green in the airport terminal 

The design team made sure this project was sustainable, as well. The terminal is currently pursuing LEED Silver certification through the U.S. Green Building Council. Approximately 14,000 sf of electrochromic glazing automatically tints the windows based on the exterior temperature and angle of the sun.

The team reused materials from old building foundations and slabs from the 1960s. The concrete was crushed and used onsite for backfill preventing the need for additional material import and the reinforcing steel was all recycled.  

The three-year construction for Terminal 4 began in May 2019 and continued through the pandemic while the airport was still in operation as a whole. Other noteworthy project details include:

  • 1.5 miles of baggage handling conveyor belts
  • 1,400 linear feet of jet fuel pipeline
  • Construction of four tunnels and two bridges. By building tunnel structures for baggage transfers, the team was able to remove the need for a costly additional basement structure.
  • 49.6 million lbs. of concrete; 1.9 million lbs. of rebar; 92,000 sf of exterior metal panel and 56,000 sf of terrazzo flooring

On the Building Team:
Owner and/or developer: City of Phoenix
Design architect: SmithGroup in partnership with Corgan
Architect of record: SmithGroup and Corgan
MEP engineer: mechanical and electrical SmithGroup/LSW Engineers; plumbing LSW Engineers
Structural engineer:  MKA
General contractor/construction manager: McCarthy
 

Phoenix Sky Harbor Terminal 4
Courtesy SmithGroup.
Phoenix Sky Harbor Terminal 4 int 2
Courtesy SmithGroup.
Phoenix Sky Harbor Terminal 4 int 3
Courtesy SmithGroup.

 

Related Stories

Airports | Feb 21, 2019

Self-service bag drops and the challenges of speeding up airport baggage check-in

More airports are asking passengers to check their own baggage. What’s the ripple effect?

Airports | Feb 10, 2019

Chicago searches for the right design to expand O’Hare Airport and make passenger connections less stressful

Competition finalists took different approaches to rethinking the logistics of a gigantic, hectic space.

Airports | Oct 31, 2018

Foster + Partners’ Mexico City Airport has been cancelled

The project was set to cost $13.3 billion.

Airports | Aug 3, 2018

Airport trends 2018: Full flights with no end in sight

As service demand surges, airports turn to technology, faster building techniques.

Airports | May 31, 2018

Denver's airport city

Cultivation of airport cities is an emerging development strategy shaped by urban planners, civic leaders, airport executives, and academics.

| May 24, 2018

Accelerate Live! talk: Security and the built environment: Insights from an embassy designer

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.

Retail Centers | Apr 19, 2018

Miami International Airport is home to the first Johnnie Walker store in the U.S.

The store will be a permanent fixture in the airport’s North Terminal.

Airports | Feb 21, 2018

Terminal Modernization: Why Bother? Part II

This is the second post in our series examining why airport operators should bother to upgrade their facilities, even if capacity isn’t forcing the issue.

Airports | Feb 7, 2018

LaGuardia Airport receives eight private work booths in Terminal B

 The hub sees over 15 million travelers annually.

Libraries | Jan 29, 2018

Commercial plane that skidded off the runway may become Turkey’s newest public library

The plane was removed from its cliffside perch five days after the incident.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021