Architecture firm Stark James, LLC has released plans for an apartment complex in downtown Phoenix that will be made from shipping containers. According to Jetson Green, the apartment complex, called Containers on Grand, was inspired by the need for affordable and sustainable housing near the city's core.
Containers on Grand will be located at 12th and Grand avenues and constructed with 16 containers to create eight living units, each 740 sf.
Floor plans for the apartments are open and modern, and are designed to accentuate the container structure. Each unit will have one bedroom, a bathroom, a kitchen island, and a large living room with room for storage. Two containers will be joined by cutting away one of the longer sides of each container to be welded together.
The apartments' living areas will open to a central courtyard through double French windows, which will flood the spaces with natural light.
The Containers on Grand complex is expected to be completed by the end of spring. Stark James said that there is a lot of interest in the apartments from young professionals and students who attend Arizona State University's downtown campus. Rent will be $950-$1,000 per month.
Related Stories
Architects | May 9, 2017
Movers + Shapers: The social connector
Studio Gang gains fans with buildings that unite people and embrace the outside world.
Sponsored | Building Team | May 8, 2017
The builder is the building: Finding the right builder
The most important factor in making sure the where, when, what, and how go smoothly is making sure you pick the right who.
Architects | May 3, 2017
Avoiding trouble in paradise: Tips on building successfully in the Caribbean
The island setting itself is at the root of several of these disruptive assumptions.
Libraries | Apr 7, 2017
Eight recipients selected for the 2017 AIA/ALA Library Building Awards
Columbus Metropolitan Library, National Library of Latvia, and Varina Area Library were all honored by the AIA and ALA.
K-12 Schools | Apr 7, 2017
Is an alternative project delivery method right for your K-12 school district?
With California’s increasingly busy—and costly—construction market, it’s becoming more difficult to predict costs with a typical design-bid-build delivery method.
Market Data | Apr 6, 2017
Architecture marketing: 5 tools to measure success
We’ve identified five architecture marketing tools that will help your firm evaluate if it’s on the track to more leads, higher growth, and broader brand visibility.
Sports and Recreational Facilities | Apr 5, 2017
Informed design: A dynamic approach to athletic facilities design
With the completion of the athletic facility upgrade—dubbed the Arden Project—students will have access to state-of-the-art facilities.
Building Team | Apr 4, 2017
Dispelling five myths about post-occupancy evaluations
Many assume that post-occupancy (POE) is a clearly-defined term and concept, but the meaning of POE in practice remains wildly inconsistent.
Office Buildings | Apr 4, 2017
Amazon’s newest office building will be an ‘urban treehouse’
The building will provide 405,000 sf of office space in downtown Seattle.
Healthcare Facilities | Mar 31, 2017
The cost of activating a new facility
Understanding the costs specifically related to activation is one of the keys to successfully occupying the new space you’ve worked so hard to create.