Informed design: A dynamic approach to athletic facilities design


By Arash Izadi | LPA | April 5, 2017

Established in 1889, Marlborough School, located in Los Angeles, California, is the oldest independent girls’ school in Southern California. With more than 71 percent student participation in athletics, and 36 teams for 12 sports, athletics are a key part of the education process and overall wellness of the students at Marlborough.

The project was initially proposed to be a pool and field facility, however, throughout the design development process, our design team's goal was to satisfy the school’s programmatic needs on a site with challenging constraints. Additionally, given our higher education design experience, it was important to the client that their middle and high school students be prepared for what they may experience at higher education institutions. We met with the school’s athletic director and athletic teams to understand their needs and holistically address their current restrictions. Ultimately, the project design evolved to include a multisport synthetic field, tennis courts, training and fitness room, wellness facility and aquatic center, a new garden and an increased parking to easily accommodate patrons. With the completion of the athletic facility upgrade—dubbed the Arden Project—students will have access to state-of-the-art facilities.

An urban site in the middle of downtown Los Angeles with nearby home communities and historic preservations zones, the design had to be modified to accommodate Conditional use permits (CUP) of the city in regards to sound and structure specifications. Including multiple programs on a unique site ultimately led to the design of a 25-yard by 33-meter competition swimming pool on top of a two-level building, with one story below grade.

 

 

To execute the complex nature of the project, the collaboration of disciplines, from architecture, interior design, landscape architecture, mechanical engineering, civil engineering, electrical engineering—all in-house by our integrated design team—required constant communication and a seamless work process.

During the process, the design team performed an extensive amount of research, from energy costs for pools, waterproofing, synthetic and natural field surfaces, geothermal cooling systems, solar heating, sustainability, stormwater management, efficient irrigation and acoustics. Every decision had to be methodical and systematic.

The result of this informed team process is the Arden Project—a 9,850-square-foot state-of-the-art aquatic and fitness complex, a multisport synthetic field, tennis courts, a new garden and increased parking to easily accommodate patrons.

The Arden Project, which officially opened for the 2016 to 2017 school year, transformed the Marlborough School to enhance their many athletic programs—including water polo and competitive swimming. Furthermore, it enhanced the overall campus culture by providing much needed open space for student activities and Marlborough traditions.

 

More from Author

LPA | Apr 28, 2021

Did the campus design work?

A post-occupancy evaluation of the eSTEM Academy provides valuable lessons for future campuses.

LPA | Feb 23, 2021

Rising costs push developers to consider modular construction

The mainstreaming of modular construction offers a cost-effective and creative solution to develop new types of urban developments.

LPA | May 20, 2020

From shopping mall to eSports supercenter

An aging shopping mall is reimagined as an eSports-focused mixed-use facility, creating new links between the community and the growing eSports industry.

LPA | Feb 1, 2019

Designing a net zero aquatic center

Buildings can be designed to cut consumption and operate more efficiently, but the pools always make it difficult to achieve substantial savings.

LPA | Jan 2, 2019

Rebuild or renovate?

With some facilities, a little creativity can save money and salvage a building worth saving. 

LPA | Aug 3, 2018

Seismic deadlines approaching for healthcare companies

California hospitals can save money with a holistic approach to retrofit issues.

LPA | Jun 28, 2018

Designing successful maker spaces

The challenge is to design makerspaces that work, spaces that function as a tool for educators to produce better students.

LPA | Dec 6, 2017

Designing K-12 schools from the inside out

A step-by-step process finds better answers, saves money, and produces measurable results.

LPA | Oct 26, 2017

Where campus meets corporate design

A building is much more than its appearance; it’s how the user will behave inside of it that determines its adaptability.

LPA | Sep 8, 2017

The economic case for engaged classrooms in K-12 schools

Flexible, modern classrooms should be viewed as a key element of a sound financial strategy, producing a solid return-on-investment.

boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

 


Magazine Subscription
Subscribe

Get our Newsletters

Each day, our editors assemble the latest breaking industry news, hottest trends, and most relevant research, delivered to your inbox.

Subscribe

Follow BD+C: