flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Perkins&Will to design new gateway building for the University of British Columbia

University Buildings

Perkins&Will to design new gateway building for the University of British Columbia

The building will transform the arrival experience for students, staff, and visitors.


By David Malone, Associate Editor | April 29, 2021
UBC gateway building exterior
UBC gateway building exterior

Perkins&Will, in collaboration with Schmidt Hammer Lassen, will design the new health science and research building at the entrance to the University of British Columbia’s Point Grey campus.

The 270,000-sf gateway building will co-locate the School of Nursing, the School of Kinesiology, Integrated Student Health Services, and components of UBC Health and Language Sciences. It will include a mix of spaces ranging from wet and dry labs, clinical spaces, lecture theatre and classrooms, gym and fitness facilities, and office and administrative functions.

 

UBC gateway building exterior green space

 

The building will feature clear and accessible circulation paths, inclusive washrooms and change rooms, and comfortable and inviting spaces that incorporate natural materials. A large public plaza and landscaping will invite people into the public space that flows throughout the building.

A central daylight-filled, six-story atrium with large interconnecting stairs reaching form the basement to the upper floors will encourage physical activity. The atrium’s open layout and visible central spaces will help to foster interdisciplinary collaboration. Additionally, windows on the ground floor will provide a connection to the landscaped outdoor environment.

 

UBC gateway building interior atrium

 

The project will also acknowledge the host nation’s past and current presence and serves as a catalyst and model for future Musqueam engagement on campus. The building will express commonalities between Musqueam values, culture, and learning as well as take inspiration from traditional Musqueam building materials and design.

The project is targeting LEED v4 Gold certification with the design team proposing to use exposed mass timber for the building’s structure. The project is slated for completion in 2024.

 

UBC gateway building lobby space

Related Stories

Giants 400 | Aug 21, 2022

Top 110 Architecture/Engineering Firms for 2022

Stantec, HDR, HOK, and Skidmore, Owings & Merrill top the rankings of the nation's largest architecture engineering (AE) firms for nonresidential and multifamily buildings work, as reported in Building Design+Construction's 2022 Giants 400 Report.

Giants 400 | Aug 20, 2022

Top 180 Architecture Firms for 2022

Gensler, Perkins and Will, HKS, and Perkins Eastman top the rankings of the nation's largest architecture firms for nonresidential and multifamily buildings work, as reported in Building Design+Construction's 2022 Giants 400 Report.

Giants 400 | Aug 19, 2022

2022 Giants 400 Report: Tracking the nation's largest architecture, engineering, and construction firms

Now 46 years running, Building Design+Construction's 2022 Giants 400 Report rankings the largest architecture, engineering, and construction firms in the U.S. This year a record 519 AEC firms participated in BD+C's Giants 400 report. The final report includes more than 130 rankings across 25 building sectors and specialty categories. 

Daylighting | Aug 18, 2022

Lisa Heschong on 'Thermal and Visual Delight in Architecture'

Lisa Heschong, FIES, discusses her books, "Thermal Delight in Architecture" and "Visual Delight in Architecture," with BD+C's Rob Cassidy. 

AEC Tech | Aug 8, 2022

The technology balancing act

As our world reopens from COVID isolation, we are entering back into undefined territory – a form of hybrid existence.

Multifamily Housing | Aug 4, 2022

Faculty housing: A powerful recruitment tool for universities

Recruitment is a growing issue for employers located in areas with a diminishing inventory of affordable housing. 

University Buildings | Jul 11, 2022

Student life design impacts campus wellness

As interior designers, we have the opportunity and responsibility to help students achieve deeper levels of engagement in their learning, social involvement, and personal growth on college campuses.

University Buildings | Jul 6, 2022

Wenzhou-Kean University opens a campus building that bridges China’s past and future

After pandemic-related stops and starts, Wenzhou-Kean University’s Ge Hekai Hall has finally begun to see full occupancy.

University Buildings | Jun 9, 2022

IDEA Factory at U. of Maryland defies gravity

The E.A. Fernandez IDEA Factory at the University of Maryland’s A. James Clark School of Engineering has a gravity-defying form: The seven-story building’s solid upper floors emerge above the lighter, mostly glass base.

University Buildings | Jun 7, 2022

Newfoundland university STEM building emulates natural elements, local traditions

Memorial University of Newfoundland (MUN) recently opened a new building that will provide interdisciplinary learning and research space for Faculties of Science and Engineering.

boombox1 - default
boombox2 -
native1 -

More In Category

Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021