flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Oklahoma’s first modular hotel will begin construction next month

Modular Building

Oklahoma’s first modular hotel will begin construction next month

Guerdon Modular Buildings will produce 81 modules for this project. 


By John Caulfield, Senior Editor | May 17, 2016

The AC Hotel in a neighborhood in Oklahoma City will be Oklahoma's first modular-built hotel, as well as the first for its developer. Image: Courtesy Guerdon Modular Buildings 

NewcrestImage, a privately owned, Lewisville, Texas-based hotel development, construction, and management firm, plans to build the first hotel in Oklahoma to use modular construction technology.

The 142-room AC Hotel Bricktown, in Oklahoma City, will also be NewcrestImage’s first modular hotel. The developer has entered into a partnership with the manufacturer Guerdon Modular Buildings to produce the modules for this project.

ADG Inc. is the architect of record, and Duncan Miller Ullmann the interior designer of the five-story hotel. Metul Patel, NewcrestImage’s Chairman and CEO, describes the hotel’s accommodations as “European-inspired.”

The first floor will be built using traditional construction. The upper four floors will be built from 81 modules provided by Guerdon’s factory in Boise, Idaho. Modular production is scheduled to begin next month, and the finished modules are scheduled to be shipped, via flatbed trucks, over four days in October.

All rooms and finishes will follow AC Hotel specifications upon delivery, and be indistinguishable from the Marriott brand’s other hotels.

The hotel, which is scheduled to open in June 2017, and which NewcrestImage will own and operate, will be located next to the 13,000-seat Chicksaw Bricktown ballpark and within a few blocks of the Cox Convention Center.

(NewcrestImage is deploying conventional construction to build another hotel in the Bricktown neighborhood, this one a 135-room Hyatt Place, which will be adjacent to OKC’s Central Business District. It’s scheduled to open in late 2017.)

“Our goal has been to integrate closely with NewcrestImage in order to make every aspect of the construction process flawless and worry-free—everything from the design and build to mapping out the delivery and installation process,” said Lad Dawson, Guerdon’s CEO.

Earlier this year, BD+C quoted Dawson as stating that Guerdon had entered into an agreement to help “a large hotel chain” (Marriott, according to one knowledgeable source) build 1,000 modular hotel rooms per year. He did not provide specifics or timetables. But that same article quoted The Modular Building Institute and STR that more modular hotel construction in the U.S. is needed for hoteliers to keep up with rising demand from guests.

Related Stories

| Aug 11, 2010

Modest recession for education construction

Construction spending for education expanded modestly but steadily through March, while at the same time growth for other institutional construction had stalled earlier in 2009. Education spending is now at or near the peak for this building cycle. The value of education starts is off 9% year-to-date compared to 2008.

| Aug 11, 2010

'Feebate' program to reward green buildings in Portland, Ore.

Officials in Portland, Ore., have proposed a green building incentive program that would be the first of its kind in the U.S. Under the program, new commercial buildings, 20,000 sf or larger, that meet Oregon's state building code would be assessed a fee by the city of up to $3.46/sf. The fee would be waived for buildings that achieve LEED Silver certification from the U.

| Aug 11, 2010

Decline expected as healthcare slows, but hospital work will remain steady

The once steady 10% growth rate in healthcare construction spending has slowed, but hasn't entirely stopped. Spending is currently 1.7% higher than the same time last year when construction materials costs were 8% higher. The 2.5% monthly jobsite spending decline since last fall is consistent with the decline in materials costs.

| Aug 11, 2010

Luxury Hotel required faceted design

Goettsch Partners, Chicago, designed a new five-star, 214-room hotel for the King Abdullah Financial District (KAFD) in Riyadh, Saudi Arabia. The design-build project, with Saudi Oger Ltd. as contractor and Rayadah Investment Co. as developer, has a three-story podium supporting a 17-story glass tower with a nine-story opening that allows light to penetrate the mass of the building.

| Aug 11, 2010

U.S. firm designing massive Taiwan project

MulvannyG2 Architecture is designing one of Taipei, Taiwan's largest urban redevelopment projects. The Bellevue, Wash., firm is working with developer The Global Team Group to create Aquapearl, a mixed-use complex that's part of the Taipei government's "Good Looking Taipei 2010" initiative to spur redevelopment of the city's Songjian District.

| Aug 11, 2010

7 Keys to Unlocking Energy Efficiency in Schools

Today’s best K-12 schools are embracing the sustainability ethos in their design and construction, and that can mean a healthier, more comfortable indoor environment and improved learning. Some studies contend that ample amounts of daylighting, for example, lead to higher test scores. High-performance HVAC systems that constantly draw fresh air into a classroom seem to help both teachers ...

| Aug 11, 2010

Great Solutions: Green Building

27. Next-Generation Green Roofs Sprout up in New York New York is not particularly known for its green roofs, but two recent projects may put the Big Apple on the map. In spring 2010, the Lincoln Center for the Performing Arts will debut one of the nation's first fully walkable green roofs. Located across from the Juilliard School in Lincoln Center's North Plaza, Illumination Lawn will consist ...

| Aug 11, 2010

Giants 300 University Report

University construction spending is 13% higher than a year ago—mostly for residence halls and infrastructure on public campuses—and is expected to slip less than 5% over the next two years. However, the value of starts dropped about 10% in recent months and will not return to the 2007–08 peak for about two years.

| Aug 11, 2010

World's tallest all-wood residential structure opens in London

At nine stories, the Stadthaus apartment complex in East London is the world’s tallest residential structure constructed entirely in timber and one of the tallest all-wood buildings on the planet. The tower’s structural system consists of cross-laminated timber (CLT) panels pieced together to form load-bearing walls and floors. Even the elevator and stair shafts are constructed of prefabricated CLT.

boombox1 - default
boombox2 -
native1 -

More In Category




Modular Building

Building with shipping containers not as eco-friendly as it seems

With millions of shipping containers lying empty at ports around the world, it may seem like repurposing them to construct buildings would be a clear environmental winner. The reality of building with shipping containers is complicated, though, and in many cases isn’t a net-positive for the environment, critics charge, according to a report by NPR's Chloe Veltman.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021