The currently under construction IKEA at Westbahnhof will showcase the retail company’s new store concept that focuses on current shopping trends and the dramatically changing shopping behavior.
The seven-story building includes green façades, restaurants, a green roof terrace, and extra open space for customers. Something the concept does not include is parking. As more and more customers forgo carrying their purchases home and instead opt for delivery, the new IKEA concept delivers all products that are larger than “small items” to a customer’s home within a maximum of 24 hours.
The goal of Ikea at Westbahnhof is to become the meeting point for the entire district. A direct connection to the public transport network will be included and public space will be accessible outside of IKEA hours (this includes the green roof terrace). The façade on the ground floor has been set back to create an arcade and a sidewalk that is twice as wide as before. This will help increase safety in the tram stop area and create a more pleasant atmosphere for pedestrians.
See Also: Construction begins on $1.8 billion addition to the Washington State Convention Center
Ikea at Westbahnhof is currently under construction and slated for completion in 2021.
Related Stories
| Aug 11, 2010
Florida mixed-use complex includes retail, residential
The $325 million Atlantic Plaza II lifestyle center will be built on 8.5 acres in Delray Beach, Fla. Designed by Vander Ploeg & Associates, Boca Raton, the complex will include six buildings ranging from three to five stories and have 182,000 sf of restaurant and retail space. An additional 106,000 sf of Class A office space and a residential component including 197 apartments, townhouses, ...
| Aug 11, 2010
Glass Wall Systems Open Up Closed Spaces
Sectioning off large open spaces without making everything feel closed off was the challenge faced by two very different projects—one an upscale food market in Napa Valley, the other a corporate office in Southern California. Movable glass wall systems proved to be the solution in both projects.
| Aug 11, 2010
CityCenter Takes Experience Design To New Heights
It's early June, in Las Vegas, which means it's very hot, and I am coming to the end of a hardhat tour of the $9.2 billion CityCenter development, a tour that began in the air-conditioned comfort of the project's immense sales center just off the famed Las Vegas Strip and ended on a rooftop overlooking the largest privately funded development in the U.
| Aug 11, 2010
The softer side of Sears
Built in 1928 as a shining Art Deco beacon for the upper Midwest, the Sears building in Minneapolis—with its 16-story central tower, department store, catalog center, and warehouse—served customers throughout the Twin Cities area for more than 65 years. But as nearby neighborhoods deteriorated and the catalog operation was shut down, by 1994 the once-grand structure was reduced to ...
| Aug 11, 2010
American Tobacco Project: Turning over a new leaf
As part of a major revitalization of downtown Durham, N.C., locally based Capitol Broadcasting Company decided to transform the American Tobacco Company's derelict 16-acre industrial plant, which symbolized the city for more than a century, into a lively and attractive mixed-use development. Although tearing down and rebuilding the property would have made more economic sense, the greater goal ...