The Building Button, a new tool launched by the Investor Confidence Project (ICP), standardizes the collection of data from energy efficiency projects, and “makes it easy to share that information with investors, building owners, developers, and utilities,” according to a news release.
Based on the U.S. Department of Energy’s Building Energy Data Exchange Specification, the tool integrates best practices and specifications developed by ICP and the U.S. Department of Energy’s Lawrence Berkeley National Laboratory (Berkeley Lab), including the Building Energy Data Exchange Specification (BEDES). Expressing energy efficiency data in a common language, the Building Button allows all parties to compare specifications across multiple projects with one click. This ability helps to reduce underwriting and actuarial analysis costs, builds trust in energy savings, and drives market demand for energy efficiency projects.
“One of the major barriers to wide-scale adoption of energy efficiency is the hassle factor,” said Matt Golden, ICP director. “Every investment is unique, with data lodged in incompatible spreadsheets, documents, and other digital files. The lack of uniform data standards means that transaction costs are prohibitively high. The Building Button helps solve that by establishing guidelines for all project data, streamlining the process of project development and investment.”
In 2017, ICP will join Green Building Certification Inc. (GBCI) to create the first global underwriting standard for energy efficiency projects.
Related Stories
| Dec 1, 2011
VLK Architects’ office receives LEED certification
The West 7th development, which houses the firm’s office, was designed to be LEED for Core & Shell, which gave VLK the head start on finishing out the area for LEED Silver Certification CI.
| Nov 29, 2011
Report finds credit crunch accounts for 20% of nation’s stalled projects
Persistent financing crunch continues to plague design and construction sector.
| Nov 28, 2011
Nauset Construction completes addition for Franciscan Hospital for Children
The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.
| Nov 22, 2011
Report finds that L.A. lags on solar energy, offers policy solutions
Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.
| Nov 22, 2011
New Green Matters Conference examines emerging issues in concrete and sustainability
High-interest topics will be covered in technical seminars, including infrared reflective coatings for heat island mitigation, innovative uses of concrete to provide cooling and stormwater management, environmental benefits of polished concrete, and advancements in functional resilience of architectural concrete.
| Nov 15, 2011
Suffolk Construction breaks ground on the Victor housing development in Boston
Project team to manage construction of $92 million, 377,000 square-foot residential tower.
| Nov 8, 2011
Transforming a landmark coastal resort
Originally built in 1973, the building had received several alterations over the years but the progressive deterioration caused by the harsh salt water environment had never been addressed.
| Nov 4, 2011
CSI and ICC Evaluation Service agree to reference GreenFormat in ICC-ES Environmental Reports?
ICC-ES currently references CSI's MasterFormat and other formats in all of its evaluation reports. The MOU will add GreenFormat references.
| Nov 4, 2011
McCarthy completes construction of South Region High School No. 2 in Los Angeles
Despite rain delays and scope changes, the $96.7 million high school was completed nearly two-months ahead of schedule.
| Nov 2, 2011
John W. Baumgarten Architect, P.C, wins AIA Long Island Chapter‘s Healthcare Award for Renovation
The two-story lobby features inlaid marble floors and wood-paneled wainscoting that pays homage to the building’s history.