flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

New skatepark complex has three levels of surfaces and obstacles

Sports and Recreational Facilities

New skatepark complex has three levels of surfaces and obstacles

Guy Hollaway Architects designed an indoor 10,700-sf park in Folkestone, England, to accommodate BMX biking, skateboarding, and other extreme sports.


By Mike Chamernik, Associate Editor | March 29, 2016

Images courtesy Guy Hollaway Architects. Click photos to enlarge. (Click here to enlarge lede image).

Skateboarders and BMXers have long preferred skating and biking on streets and in public areas rather than in skateparks. 

It’ll be tough for them to turn down a three-story facility filled with ramps, pipes, and rails.

Guy Hollaway Architects designed a 10,700-sf skatepark complex for Folkestone, England. According to the firm, this will be the first multi-story facility of its kind.

The park is designed for skateboarding, BMX-ing, rollerblading, scootering, and each level will have quarter-pipes, stairs, slopes, ramps, and ledges. It will also have walls for rock climbing, tracks for trial cycling, a boxing gym in the basement, a cafe, and a rooftop area. 

The Architect’s Newspaper reports that the building will be enclosed in two layers of metal mesh, which allow for ventilation. 

Construction is set to begin, and the complex will open in two years.

 

Related Stories

Sports and Recreational Facilities | Jul 16, 2021

A new stadium in San Diego tops off

This will be part of a 135-acre campus innovation district.

Sports and Recreational Facilities | Jul 13, 2021

New York Liberty unveil new locker room renovation project at Barclays Center

A women-led team from Shawmut Design and Construction and Generator Studios conceptualized and completed the project.

Resiliency | Jun 24, 2021

Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]

New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

Sports and Recreational Facilities | May 17, 2021

Indoor volleyball and basketball complex set for St. Louis

The project will be the largest youth volleyball and basketball facility in St. Louis.

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021