The replacement and expansion project for the North Terminal at Louis Armstrong New Orleans International Airport has just about reached the midway point in construction. Originally projected to have 30 terminals across 650,000 sf and cost $650,000,000, increased passenger demand has caused all of these numbers to inflate.
According to city officials, the project is adding an additional five gates for $110 million, bringing the total price tag up to about $917 million. The terminal now sits at an estimated 802,000 sf.
Pelli Clarke Pelli Architects and Atkins collaborated on the design for the new terminal, which, despite being designed with 30 gates, allowed for the easy expansion of up to 42 gates, if necessary. Some of the design’s features include a 2,000-space parking garage, Interstate-10 highway connection, retail development, airline ticketing offices, and consolidated security screening.
Construction on the terminal began one year ago and, despite the addition of the five extra gates, the project is still scheduled to open on Oct. 1, 2018. Construction is being led by a joint venture between Hunt Construction, Gibbs Construction, Boh Brothers, and Metro Service Group.
Rendering courtesy of Leo A Daly.
Rendering courtesy of Leo A Daly.
Rendering courtesy of Leo A Daly.
Related Stories
| Jul 18, 2013
Top Government Sector Engineering Firms [2013 Giants 300 Report]
Fluor, URS, AECOM top Building Design+Construction's 2013 ranking of the largest government sector engineering and engineering/architecture firms in the U.S.
| Jul 18, 2013
Top Government Sector Architecture Firms [2013 Giants 300 Report]
Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest government sector architecture and architecture/engineering firms in the U.S.
| Jul 18, 2013
GSA regains stature under Tangherlini, who looks to trim its holdings, cut energy costs [2013 Giants 300 Report]
Over the past 15 months, Acting GSA Administrator Dan Tangherlini has done a creditable job of restoring the agency’s standing with Congress and the public.
| Jul 2, 2013
LEED v4 gets green light, will launch this fall
The U.S. Green Building Council membership has voted to adopt LEED v4, the next update to the world’s premier green building rating system.
| Jul 1, 2013
Report: Global construction market to reach $15 trillion by 2025
A new report released today forecasts the volume of construction output will grow by more than 70% to $15 trillion worldwide by 2025.
| Jun 28, 2013
Building owners cite BIM/VDC as 'most exciting trend' in facilities management, says Mortenson report
A recent survey of more than 60 building owners and facility management professionals by Mortenson Construction shows that BIM/VDC is top of mind among owner professionals.
| Jun 5, 2013
USGBC: Free LEED certification for projects in new markets
In an effort to accelerate sustainable development around the world, the U.S. Green Building Council is offering free LEED certification to the first projects to certify in the 112 countries where LEED has yet to take root.
| Jun 3, 2013
Construction spending inches upward in April
The U.S. Census Bureau of the Department of Commerce announced today that construction spending during April 2013 was estimated at a seasonally adjusted annual rate of $860.8 billion, 0.4 percent above the revised March estimate of $857.7 billion.
| May 20, 2013
4 emerging trends in parking structure design
Survey of parking professionals reveals how technology is transforming the parking industry.
| Apr 30, 2013
Tips for designing with fire rated glass - AIA/CES course
Kate Steel of Steel Consulting Services offers tips and advice for choosing the correct code-compliant glazing product for every fire-rated application. This BD+C University class is worth 1.0 AIA LU/HSW.