Infection control, a constant worry for hospital administrators and clinical staffs, is heightened when the hospital is undergoing a major construction project. Avoiding contamination of their facilities and medical equipment while construction work is going on—say, for a new addition or a major upgrade—can be particularly difficult when the hospital’s equipment sterilization unit is located anywhere near or in the path of the construction work.
About 18 months ago, Atlanta-based STERIS, a provider of technologies for surgical and critical care, contamination control, and infection protection, introduced Mobile Sterilization Solutions, a mobile sterile-processing department that can support a hospital’s sterilization systems during construction or in the event of a disaster.
The 53-foot-long unit can be driven to the hospital site on a tractor trailer and dropped off. Fully deployed, the unit expands to a width of about 34 feet.
Its V-PRO 1 low-temperature sterilization system is set up to process large volumes of heat- and moisture-sensitive devices. Its AMSCO 400 Series medium-steam sterilizer can sterilize heat- and moisture-stable materials in packs up to 25 pounds and still meet current compliance guidelines.
The mobile unit uses CS-iQ sterile processing workflow management software, which can manage documents and records electronically and provide status reports on equipment-monitoring results and daily maintenance notifications.
Steris’s Chris Antonucci says four units are currently in operation. Some hospitals have deployed the units for as long as a year.
Read about more innovations from BD+C's 2014 Great Solutions Report.
Related Stories
| Oct 4, 2011
GREENBUILD 2011: Wall protection line now eligible to contribute to LEED Pilot Credit 43
The Cradle-to-Cradle Certified Wall Protection Line offers an additional option for customers to achieve LEED project certification.
| Oct 3, 2011
Magellan Development Group opens Village Market in Chicago’s Lakeshore East neighborhood
Magellan Development Group and Hanwha Engineering & Construction are joint-venture development partners on the project. The Village Market was designed for Silver LEED certification by Loewenberg Architects and built by McHugh Construction.
| Oct 3, 2011
Balance bunker and Phase III projects breaks ground at Mitsubishi Plant in Georgia
The facility, a modification of similar facilities used by Mitsubishi Heavy Industries, Inc. (MHI) in Japan, was designed by a joint design team of engineers and architects from The Austin Company of Cleveland, Ohio, MPSA and MHI.
| Oct 3, 2011
Cauceglia to lead Allsteel’s global accounts
Cauceglia is responsible for developing new global business strategies and expanding existing business within the Fortune 500 sector.
| Sep 30, 2011
BBS Architects & Engineers completes welcoming center at St. Charles Resurrection Cemetery
The new structure serves as the cemetery's focal architectural point and center of operations.
| Sep 30, 2011
Kilbourn joins Perkins Eastman
Kilbourn joins with more than 28 years of design and planning experience for communities, buildings, and interiors in hospitality, retail/mixed-use, corporate office, and healthcare.
| Sep 30, 2011
Design your own floor program
Program allows users to choose from a variety of flooring and line accent colors to create unique floor designs to complement any athletic facility.
| Sep 30, 2011
AAMA offers electronic technical documents with launch of virtual library
This new program offers a system for members to purchase annual licenses in order to offer electronic versions of AAMA publications in an effort to make AAMA’s technical information resources more readily available to their employees.
| Sep 29, 2011
Submit your Great Solutions
Profiles of Great Solutions will appear in December 2011 issue of Building Design+Construction.
| Sep 29, 2011
Busch Engineering, Science and Technology Residence Hall opens to Rutgers students
With a total development cost of $57 million, B.E.S.T. is the first on-campus residence hall constructed by Rutgers since 1994.