flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

New Long Beach office building reflects Mid-Century Modern garden-style motif

New Long Beach office building reflects Mid-Century Modern garden-style motif

Built on former oil well site that had been considered undevelopable.


By Peter Fabris, Contributing Editor | September 20, 2022
Laserfiche Headquarters ext
Courtesy Paul Vu.

The new Long Beach, Calif., headquarters of Laserfiche, a provider of intelligent content management and business process automation software, was built on a brownfield parcel previously considered undevelopable. The project began with capping eight abandoned oil wells and included the removal of several storage tanks. The 102,840 sf development consists of four floors and a parking garage. The building can accommodate 550 full time in-office employees, or up to 750 hybrid workers.

Constructed on a prominent corner of a new tech corridor in northern Long Beach, the building’s design gives nods to a garden office structure across the street designed by Mid-Century Modern architect Ed Killingsworth. The scale and style of that iconic building provided a design reference point. The massing of the structure is turned 90 degrees and stepped back at the upper floors to relate to the scale of the garden office. The upper floors then slide to shade the building on the south face and create decks on the north face for socializing and connecting to nature via treetops and mountain views.

The building core is located on the west facade to minimize the need for windows, resulting in a dramatic reduction of afternoon heat gain. Moving the core from the center of the building to the western edge also created an expansive connected work area providing flexibility in the work environment. Two locations have dramatic double height spaces. One, located at the entry, provides for a two story “outdoor porch” and lobby with a tranquility koi pond. The second location, called “Skylab,” is positioned on the top floor with views of downtown Long Beach, the Pacific Ocean, and the Palos Verdes Peninsula. This a flexible “ideation space” for employee teams and serves as a beacon to motorists traveling on the busy 405 Freeway.

Each floor features individual work areas, large and small conference spaces, and expansive flex areas that can be rearranged with mobile furniture. Wide and naturally lit stairwells connect all levels, providing inviting passageways that encourage use to promote health and wellness. Natural wood, stone, and concrete paired with the brand color of dark blue and distinctive orange guide and define the palette.

The project aimed for LEED Platinum. The design considers water consumption and rainwater retention, as well as energy uses, air quality, and ventilation. Vertical and horizontal fins increase energy efficiency and promote thermal comfort by providing solar shading to the building. All employees have access to natural light at their workstations.

On the Building Team:
Owner and/or developer: Laserfiche
Design architect: Studio One Eleven
Architect of record: Studio One Eleven
MEP engineer: Southland Engineering
Structural engineer: Structural Focus
General contractor/construction manager: Millie & Severson

Laserfiche Headquarters ext 2
Courtesy Paul Vu.
Laserfiche Headquarters ext 3
Courtesy Paul Vu.
Laserfiche Headquarters int
Courtesy Paul Vu.
Laserfiche Headquarters int 2
Courtesy Paul Vu.

 

Related Stories

| Oct 18, 2011

Dow Building Solutions invests in two research facilities to deliver data to building and construction industry

  State-of-the-art monitoring system allows researchers to collect, analyze and process the performance of wall systems.

| Oct 17, 2011

Big D Floor covering supplies to offer Johnsonite Products??

Strategic partnership expands offering to south and west coast customers. 

| Oct 17, 2011

Schneider Electric introduces UL924 emergency lighting control devices

The emergency lighting control devices require fewer maintenance costs and testing requirements than backup batteries because they comply with the UL924 standard, reducing installation time. 

| Oct 14, 2011

AISC develops new interoperability strategy to move construction industry forward

AISC is working to bring that vision to reality by developing a three-step interoperability strategy to evaluate data exchanges and integrate structural steel information into buildingSMART's Industry Foundation Classes.

| Oct 12, 2011

Vertical Transportation Systems Reach New Heights

Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently. 

| Oct 12, 2011

Building a Double Wall

An aged federal building gets wrapped in a new double wall glass skin.

Office Buildings | Oct 12, 2011

8 Must-know Trends in Office Fitouts

Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.

| Oct 12, 2011

FMI’s Construction Outlook: Third Quarter 2011 Report

  Construction Market Forecast: The general economy is seeing mixed signs.

| Oct 11, 2011

Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center

  For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment. 

| Oct 11, 2011

ThyssenKrupp elevator cabs validated by UL Environment

The conclusive and independent third-party validation process is another step toward a green product line.

boombox1 - default
boombox2 -
native1 -

More In Category


AEC Innovators

3 ways the most innovative companies work differently

Gensler’s pre-pandemic workplace research reinforced that great workplace design drives creativity and innovation. Using six performance indicators, we're able to view workers’ perceptions of the quality of innovation, creativity, and leadership in an employee’s organization.


Laboratories

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021